Land Alteration App. # App-2022-008864, UID # 205302
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Cynthia K. Killmer
Phone:
(612245 - 4466
Email Address:
killm001@umn.edu
Mailing Address:
38294 296th Lane
Aitkin MN 56431 4347
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
24-0-054312NORDLAND TWPS:29 T:46 R:26LONE LAKE - NORDLAND - BACK LOTKILLMER, CYNTHIAKILLMER, CYNTHIA
Driving directions to the property from Aitkin.:
Go South on Hwy 169 approximately 7 miles.  Take a left (go East) on Cty Rd 28, at Farm Island.  Go approximately 5 miles to Cty Rd 81.  Take a left (go North) on Cty Rd 81.  Go approximately 1/2 mile to 296th Avenue, take left.   Go straight up hill.  Second driveway on your right.  

38294 296th Lane, Aitkin MN  56431

Project Description

Please describe your proposed project:
We will have 10 large trees and slashing cleared in a 60' x 60' area in the NW corner of the property.   Set back 40' from North property line marker.

Excavator states 180 yards of screen sand fill.  Excavator is John Benson Excavating.

We will be meeting and working with John to put in place erosion control before construction.  We have straw bales, and access to more.  Following construction, we will be planting native woodland plants/shrubs/mosses to blend into the existing woodland environment.

Our intentions are to build a Monitor style pole building, 38' x 40'.  Builder is Northland Buildings.
Will you be removing vegetation during this project? Yes

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 10
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Mechanical Clearing
Hand Clearing
Please explain:
John Benson Excavation has been contracted to prepare the site for building.  He will be removing the trees and underbrush with equipment that they have and use.  Chainsaws will probably be used.  As well as land machines.  John has identified 10 large trees to be removed plus slashing.

Excavation Details

Nature of Material to be used?
(Check all that apply)
Sand
Gravel
Total Amount of Excavation and/or Fill proposed? (cubic yards) 180 CuYd
Total Area to be Graded and/or Filled? (L x W) 2304 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
We will work with John Benson Excavating in preparing any erosion control issues he finds previous to construction.  We have straw bales available.  The piece of property is fairly level.  Once the trees are removed, he will bring in screen sand fill for the building pad.  Outer perimeter of top soil will be regraded.  We will plant native woodland plants/grasses/mosses in those areas to blend it back into the woodland environment following construction.  *We just picked-up 80 bare root shrubs from the Aitkin County Soil & Water plant sale!

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #55100 (05/19/2022)

Charge Cost Quantity Total
Non-Taxable
added 05/19/2022 1:17 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 05/20/2022$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantCynthia K. Killmer - 05/19/2022 3:48 PM
c0352b6860a08b7ac041b43808144e95
f4db490d31d5486baf457ec5d9cd02d0

Public Notes

Text:
Denied. Proposed project area within wetland and amount of fill would exceed WCA 
de minimis exemption

Onsite inspection was conducted

Refund of $100 issued 6/29/22 KB
File(s):

    Internal Notes

    Text:
    File(s):
      Powered by