App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | jeacaa@hotmail.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 169 to Pioneer ave go west to 432nd place left. to adderess |
Project Description
Please describe your proposed project: | Remove existing riprap. Install larger boulders north side of project 2 to3 ft boulders. Roughly 25 ft in length 4 ft high. above wall install outcropping stones and plants to stabilize hillside. East side rip rap with 2 ft boulders 6 to 7 ft back from OHW 20 ft in width south side wall roughly 20ft long and 4 ft high |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of fill disposal, if done on site. Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Boulders |
If other, please explain: | Walls will be installed where riprap is. No fill should leave or be brought into site. Just boulders |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 24 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 2040 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence |
If other, please explain: | Stapled Sod |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Silt fences and straw bales will be installed from start until sod has taken root. Wide rooting plants will be installed on hillside. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #55075 (05/17/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/17/2022 6:24 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 05/17/2022 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Michael J. Donovan - 05/17/2022 3:19 PM c1220cfccfa990d2a32ae44a18944679 378b5952c98824caeab9275d8dc3d48b | |
#1 Adminstrative Approval Group | Henry Egland - 05/20/2022 12:20 PM f02bef4254eb3509df35358eb1b28cdc 4f1b0f16c857887a8dc7fa5e483d83b5 | |
#2 Inspector Group | Henry Egland - 05/20/2022 12:22 PM 61b2be6cac56c013578643a72db73f49 c4f836bff5097c30daa397a1e2d779db | |
#3 Final Action | Molly Oestreich - 05/20/2022 12:30 PM 6fa1cb6a9532ab847cdd76583ff8ab50 e0b3d93ca14b820c7c33e47f4847e043 |
Text: | Permit #46919. Approved for Land Alteration |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 05/17/2022 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | Yes |
Base Flood Elevation: |