OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | jswaggert@gmail.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Hwy 47 south to 280th St East to 310th south to 275th E to address |
Project Description
Please describe your proposed project: | Rip Rap and plantings per henrys email below Good Morning, Becky just forwarded your shoreland question and wanted to reach out to go over it with you. I am taking over most of the shoreland alterations and have a couple ideas to solve this issue. Unfortunately the concrete planks with grass would be more of an access which we wouldn?t allow, but I do believe this property would be a good suit for rip-rap and some revegetation. I think if we do rip-rap in the area where the dock and lift gets pulled out would solve both the issues at hand. The erosion issue would be fixed with a 3:1 slope of the incorporated rip-rap, but also give them enough of a ?ramp? to get there dock and lifts in and out. Along with the rip-rap, I noted if we can get some revegetation right next to the tree, this would help stabilize that bank as well. I have attached my sketch on what I think would work best. Let me know what you think and if they would like to get this started all they would need is a land alteration permit. Thanks, Henry Egland Zoning Technician henry.egland@co.aitkin.mn.us 307 2nd Street NW, Rm 219, Aitkin, MN 56431 218-927-3577 www.co.aitkin.mn.us |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 10 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 250 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
floating boom during construction seed and straw upon completion |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #54934 (05/02/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/02/2022 7:37 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 05/02/2022 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Joe W. Emery - 05/02/2022 7:37 AM 216bb553c80b24cb6ab10d0ede388918 b779d10d7d3718bb4dde5c637743d605 |
#1 Adminstrative Approval Group | Henry Egland - 05/02/2022 7:47 AM cf3198399658cfd88b185aaa09e4c658 3782932679fb8a831f07c53f0a2c9f6f |
#2 Inspector Group | Henry Egland - 05/06/2022 9:47 AM 1abfef3bc3e47434a2e60361d864290b 6e8350a2a196415822bb6568ae40169a |
#3 Final Action | Molly Oestreich - 05/06/2022 9:58 AM 774950e9212a7a8504c963684e84c3a9 a005016c9822c36f642d9d8a86cdb479 |
Public Notes
Text: | Permit #46848. Approved for land alteration - Rip-rap not to extend past line (photo attached) |
File(s): |
|
Internal Notes
Text: | |
File(s): |