OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | janinethielen@yahoo.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Take 47 south to Malmo turn east on County Road 2 go 1 mile turn south on County Road 38 go 1 mile turn east on 210th Street go about 1 mile. Second place on the left. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | Yes |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | 32x50 addition to existing saw mill shed |
What is the height of your structure? | 14 Feet |
Project Type
Item 1 - Structure Type: | Commercial Building Addition |
Item 1 - Size: | 1600 ft2 |
Site Plan
Attach Site Plan: | |
Is the site staked and ready for inspection? | Yes |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #54719 (04/14/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/14/2022 11:53 AM $400 Flat Fee |
$400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 04/15/2022 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | online submittal - 06/28/2022 9:58 AM - witnessed by Kim Burton cbcab49e91a6f813c9cce58699627e39 5ec754bd9e9fc3d88b46a0d290102486 | |
#1 Adminstrative Approval Group | Kim Burton - 06/28/2022 9:58 AM 548ff77bcf87899aac20f27daffa6889 a26146f3cc9a2188af7d7fa4820391de | |
#2 Inspector Group | Kim Burton - 06/28/2022 10:03 AM 6ff5e94af3f5055e736e2570c274807a d2b7605d6e6701009b6da66a00876f79 | |
#3 Level Three Final Action | Sarah McMillan - 06/28/2022 11:00 AM 0773dbd6f647ca8f347391033f270997 c8f24d52ee2a3e6b650cadc6de38c97a |
Text: | Permit #47049 Approved for a 32x50 commercial addition to existing sawmill shed per CUP #47025C. |
File(s): |
|
Text: | Conditions for Janine Thielen / Daniel Hershberger #2022-008672 1. Must comply with all local, state and federal regulations that pertain to this type of operation. 2. Days and hours of operation are Monday through Saturday, 7:00am to 5:00pm. 3. Must abide road maintenance agreement with Lakeside Township. |
File(s): |
Date application was complete: | 06/28/2022 |
Review started by: | Kim Burton |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | |
Road R-O-W setbacks appear to be met? | |
Bluff setbacks appear to be met? | |
Septic Tank setback appears to be met with/without an engineer's report? | |
Septic Drainfield setback appears to be met with/without an engineer's report? | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Kim Burton |
Attach necessary inspection forms/photos: | |
Notes: | Approved per CUP #47025C. |
Was an onsite conducted for this application? | Yes |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |