OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Easement approach road for property located on SW part of Taylor Lake. Culvert and easement approach is needing repair & located on: Property ID: 07-0-010105 Tax District: FARM ISLAND TWP Taxpayer Name: CORCORAN, PATRICK Directions: Hwy 210 west to Hwy 28 South, to 326th Ln, to Peony Ave (west side of loop) take Peony North to easement |
Project Description
Please describe your proposed project: | Road approach access and culvert to the property easement needs repair along with filling in the current washout area. To complete the repair we will remove the culvert and replace with two new 40-50' culverts side-by-side. Easement road on west side of approach has a steep incline going west from Peony onto the easement road. We will scrape down 3-4 ft of the easement hill to lesson the steep incline. The fill scraped off will be used to fill in the washout area on both ends of the culvert. Both ends of the culvert area will be filled with dirt(fill), drainage rock and rip-rap to create a stable drainage area on both ends of the culvert. This will help to slow and spread the water coming thru the culvert. The access road (approach) will be widened to 20 feet, to allow safer access and egress from the easement road. Currently the approach is maybe 10 ft wide with a steep incline and not safe for use as any slippery conditions could cause a vehicle to slid into the washout area. Class 5 will be added to the easement road to firm up the area that was dug out from the incline. Straw rolls and/or straw blankets will be used to assist with any erosion control. All vegetative areas will be reseeded to help with erosion. See attached diagram. I have recently purchased property on Taylor Lake and will need access across the approach/culvert to get to my property. I have contacted all the neighboring property owners and everyone is in agreement that this project needs to happen this year to prevent any further washout. I am the point of contact for the project. Property ID (PIN): 07-0-010003 Tax District: FARM ISLAND TWP Taxpayer Name: SERBUS, CURTIS |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location of all driveways and/or access roads. Location and size of alteration. Location of erosion control measures. Distance of alteration to property lines. Distance of alteration to existing structures. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 2 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing |
Please explain: | This is a repair project. Do not intend to remove any trees from this area if we do not have to. If small trees have grown into the drainage area and causing issues, they may need to be removed with a chainsaw. Small brush or shrubs in the are will be pulled out or cut with a saw. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Sand Gravel Rock Other (explain below) |
If other, please explain: | 2 New Culvert - 40-50' long. Use 15-20 yds fill to refill the washout area. landscape fabric on top of fill with 1-2 in drainage rock on top of the fabric15-20 yrd, with 15-20 yrds of Rip Rap on top of the drainage rock to stabilize and slow the flow of water out of the culvert and down the ditch. |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 30 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 1000 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching Other (explain below) |
If other, please explain: | plant bushes or shrubs to help with any erosion on the side of the ditch and hill. |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Staked straw rolls will be used both up and down hill from the culvert and left in place until seeded grass has taken root. Straw or straw blankets will be used over filled areas with a slope that are seeded and pose any erosion issues. |
Other Information
Other: | Easement access road is already in place but has washout on both sides. The intent is to replace the old culverts with 2 new culverts. Fill in the washout area, place drainage rock and rip-rap to slow and spread water. There is a steep incline from Peony onto the property that will be scraped down to lesson the incline, that dirt will be used to fill the washout area and widen the access road to allow a safer approach and egress from the easement road onto Peony Ave. Property Lines are currently staked. Electrical lines will be marked. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #54695 (04/27/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/05/2022 10:07 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 05/03/2022 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Curtis J. Serbus - 04/27/2022 10:08 PM 3c088f11399cb31b921e16afc3aa1cbb 884e42b440e0852607813b3caf0a38a8 |
#1 Adminstrative Approval Group | Henry Egland - 04/28/2022 8:24 AM e8c188b3ab21aaa941e454a484fa41b2 6ca03bf2c4edb99ca30662980f4477b5 |
#2 Inspector Group | Henry Egland - 05/04/2022 8:54 AM 83838b3143e8d65a438edcdb1182111b b63d8485b9006968cfa7d68981efca7c |
#3 Final Action | Molly Oestreich - 05/04/2022 11:48 AM 6a30d6e701a904f5fce903f02f416ce4 8fd3b43362dc41d9119c98eb6fe7db9d |
Public Notes
Text: | Permit #46838. Approved for Land Alteration - Culvert/Erosion Repair |
File(s): |
|
Internal Notes
Text: | |
File(s): |