Land Use Application Permit # 2023-0397, App. # App-2022-008597, UID # 204837
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Huston Hussman
Phone:
(612358 - 3003
Email Address:
huston@yellowtreecorp.com
Mailing Address:
50917 Long Point Place
Mcgregor MN 55760
Are you the Property Owner? No

Property Owner Contact

Property Owner Email: doug.hussman@gmail.com
Property Owner Phone:
(952232 - 9694

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-46340050917 Long Point Pl
MCGREGOR, MN 55760
SHAMROCK TWPISLE VIEWS:7 T:49 R:23GDBIG SANDY LAKELUEDKE, CINDY J & HUSSMAN, DOUGLASLUEDKE, CINDY J & HUSSMAN, DOUGLAS
Enter directions to the property (if no property address assigned):
North 169  take a right on 210 East.

Take 210 East to highway 65, turn left to 65 north.

Take Highway 65 North to Bridge road/Long Point Place. Turn Right on Bridge Road/Long Point Place.

Take Bridge Road/Long Point place to 50917 Long Point Place. You Have Arrived.

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
Detached 30'x30' Garage. Post Framed  Steel Roof and Steel Siding.
What is the height of your structure? 21 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 900 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 116 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 2 CuYd
How close to the property line will any fill be placed or any excavation be done? 10 Feet
What percent slope of the land currently exists on the project site? 8 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
Silt Fence
Straw Bales
6.) What will be done after construction to control
erosion?
Seeding and Straw anchoring

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
New septic in design.

Design By Jerry Farley - Farley Sewer Systems - Contact (218) 839-4737

Holding Tank was approved 9/26/22 Permit #47333.
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #54654 (03/22/2022)

Charge Cost Quantity Total
Non-Taxable
added 03/22/2022 1:25 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 03/22/2022$200.00
Due$0.00
Action: Print  

Invoice #57670 (06/06/2023)

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantHuston Hussman - 06/08/2023 9:47 AM
3bb69a121564178e0d174cdabedd96a3
0100c973c0a259ebf543b8f12427781e
 
#1 Adminstrative Approval GroupConnor Plagge - 06/08/2023 2:25 PM
875d09882359001698342c5eddce9116
dd73b870c6582d602e509debadce4c39
 
#2 Inspector GroupConnor Plagge - 06/08/2023 2:26 PM
e32004b7df7b9c5c701098066a532bb2
ab0667c6d23635cc0450dd8ffeead4ca
 
#3 Level Three Final ActionConnor Plagge - 06/08/2023 3:05 PM
92b8469ba7072d12d350aa69697c8ed0
47a67267181ef8c443e4c055eb617b85
 
Application has been approved. All signatures have been obtained.
Text:
Permit #47834

Approved for a 30'x30' Accessory Building.
File(s):
Text:
File(s):
    Date application was complete: 02/07/2023
    Review started by: Connor Plagge
    Zoning District of project location: Shoreland
    Required OWHL setback distance: 75 ft.
    "Other" OHWL setback distance is:
    Project located in the floodplain? No
    Base Flood Elevation: 1223.9
    Lowest Floor Elevation: 1224.9
    Is an after construction elevation certificate required? No
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? Yes
    Septic Tank setback appears to be met with/without an engineer's report? Yes
    Septic Drainfield setback appears to be met with/without an engineer's report? N/A
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? Redevelopment
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Connor Plagge
      Attach necessary inspection forms/photos:
        Notes:
        Appears to meet all setbacks. Steep hill closest to structure is not considered a bluff as it does not meet the necessary criteria.
        
        Distance to OHWL is approximately 125'
        Was an onsite conducted for this application? Yes
        Self Install?
        Installer Name:
        None
        New Tanks:
        Existing Tanks:
        Date of Final Inspection:
        Attach Final Certificate of Installation:
          Low Interest Loan or SSTS Grant project?