Land Use Application Permit # 2022-7714, App. # App-2022-008541, UID # 204753
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Scott Bennett
Phone:
(612961 - 2098
Email Address:
scott@flashingbydesign.com
Mailing Address:
29964 Quinlan Ave
Center City MN 55012
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
34-0-02500013543 120TH PL
FINLAYSON MN 55735
WAGNER TWPS:15 T:43 R:22SAYRE, LISA & BENNETT, SCOTTSAYRE, LISA & BENNETT, SCOTT
Enter directions to the property (if no property address assigned):
Hwy 65 south to co road 18 east to 120th place south 1/2 mile to 13543 120th place.

Project Checklist

1.) Is the property zoned Shoreland? No
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
I am proposing to build a 40x60 barn with a 10x60 overhang on west side.
building is to be 280 inches in height.
What is the height of your structure? 23.33 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 3000 ft2

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? No

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #54572 (03/04/2022)

Charge Cost Quantity Total
Non-Taxable
added 03/04/2022 9:24 AM

$300 Flat Fee

$300.00 x 1 $300.00
Grand Total
Total $300.00
Payment 03/04/2022$300.00
Due$0.00

Approvals

ApprovalSignature
ApplicantScott Bennett - 03/04/2022 9:28 AM
4ee3800ecc27b8dfd656a705368675ab
cfa18709af15aea3e253fa31e799bd45
#1 Adminstrative Approval GroupShannon Wiebusch - 03/04/2022 1:16 PM
99596ddb393c44539cad0fcf144b99b7
78ad9cb3303153eaebc28ae596b0a82d
#2 Inspector GroupHenry Egland - 03/08/2022 9:47 AM
8edb36c658f573eb597ae7d6a30e2961
54995dd947c8f5f7aed8bfb5ccf5a4ff
#3 Level Three Final ActionMolly Oestreich - 03/08/2022 10:00 AM
b5fcad80254d23e240736658a0a29f16
c78ce75b586d1c92bd6e2ae324c4256f
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #46729. Approved for 40'x60' Accessory building with 10'x60' lean-to. Not for commercial use. Not for human habitation.
File(s):

Admin Checklist

Date application was complete: 03/04/2022
Review started by: Shannon Wiebusch
Zoning District of project location: Open
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? N/A
Septic Drainfield setback appears to be met with/without an engineer's report? N/A
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Henry Egland
Attach necessary inspection forms/photos:
    Notes:
    Setbacks were checked with GIS/Aerial Imagery. Talked to Scott regarding his camper on the property and he will store the camper inside the accessory structure when its not in use.
    Was an onsite conducted for this application? No
    Powered by