Land Use Application Permit # 2022-7703, App. # App-2022-008521, UID # 204696
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Chris Dybdahl
Phone:
(612388 - 7724
Email Address:
dibs2149@gmail.com
Mailing Address:
18557 Tyler Dr NW
Elk River MN 55330
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
24-1-10530030625 389th Ave
AITKIN, MN 56431
NORDLAND TWPWOODLAND DEVELOPMENTS:20 T:46 R:26RDRIPPLE LAKE (NORDLAND TWP)DYBDAHL, CHRIS & LOUISEDYBDAHL, CHRIS & LOUISE
Enter directions to the property (if no property address assigned):
Hwy 47 south to cty rd 12 go right to cty rd 39 right on 39 to 305th street left on 305th to 389th ave left on 389th the first mail box on the right #30625

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
We would like to add on to our existing house. The addition will include a 12' x 26' with a basement and a 26' x 28' garage attached to the house.
What is the height of your structure? 23 Feet

Project Type

Item 1 - Structure Type: Residence Addition
Item 1 - Size: 1352 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 290 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? Yes
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
(If yes, please attach plan):
How many cubic yards of fill or excavation will be done on the property? 200 CuYd
How close to the property line will any fill be placed or any excavation be done? 120 Feet
What percent slope of the land currently exists on the project site? 8 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
add grass and landscape

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #54517 (02/18/2022)

Charge Cost Quantity Total
Non-Taxable
added 02/18/2022 7:35 AM

$400 Flat Fee

$400.00 x 1 $400.00
Grand Total
Total $400.00
Payment 02/18/2022$400.00
Due$0.00

Approvals

ApprovalSignature
ApplicantOnline Submittal - 02/22/2022 3:57 PM - witnessed by Molly Oestreich
98f8c7a1b80c0cb823f5393a01d014bd
898af1c6d59bd3096b74460a8737657a
#1 Adminstrative Approval GroupMolly Oestreich - 02/22/2022 3:59 PM
f7610c8a8c607ebab2f24a4848ee51e5
66da2ce4bd166ff3242a92ebfc82b8ed
#2 Inspector GroupMolly Oestreich - 03/01/2022 9:02 AM
41036e20e7006c5ff3192dc84b99d908
3a2f85cd11d348d1bb7639f278213b11
#3 Level Three Final ActionMolly Oestreich - 03/01/2022 9:16 AM
11cc77f75f03b9fabe210cbe84d88be0
59428a9ee39987484c1672f93a9efaf7
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #46721. Approved for a 1352 sq ft residence addition.
File(s):

Admin Checklist

Date application was complete:
Review started by:
Zoning District of project location:
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain?
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met?
Road R-O-W setbacks appear to be met?
Bluff setbacks appear to be met?
Septic Tank setback appears to be met with/without an engineer's report?
Septic Drainfield setback appears to be met with/without an engineer's report?
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified?
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact?

Inspector Checklist

Zoning Inspector: Molly Oestreich
Attach necessary inspection forms/photos:
    Notes:
    Verified all measurements via GIS all setbacks met. 
    
    Approved for a 1352 sq ft residence addition.
    Was an onsite conducted for this application? No