OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Aitkin Minnesota 56431 Take 1st St NW to Minnesota Ave N 56 s (0.2 mi) Head south toward 1st St NW 157 ft Turn left onto 1st St NW 0.2 mi Follow US-169 N to MN-210 E in Morrison Township 9 min (8.0 mi) Turn left onto Minnesota Ave N 374 ft Turn right at the 1st cross street onto US-169 N/2nd St NE Continue to follow US-169 N 7.9 mi Follow MN-210 E and 328th Ave to 325th Pl in Fleming Township 10 min (6.0 mi) Turn right onto MN-210 E 3.1 mi Turn left onto 328th Ave 2.0 mi Slight right onto 328th Pl 0.8 mi Turn right onto 325th Pl Destination will be on the left 351 ft 43152 325th Pl Palisade, MN 56469 |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | After the fact permit for a shed. Shed is 10'X10' |
What is the height of your structure? | 12 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 100 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 144 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 1 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 20.5 Feet |
What percent slope of the land currently exists on the project site? | 1 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Plant grass |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
Per Henry Egland staking is not necessary since this is an after the fact permit |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #54508 (02/15/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 02/18/2022 7:19 AM $50 Flat Fee |
$50.00 | x 1 | $50.00 |
Grand Total | |||
Total | $50.00 | ||
Payment 02/27/2022 | $50.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Steven Massey - 02/27/2022 7:47 PM f299cc54a212cd577b04de9eb6793f8a c39c5edb83759df46eefb7e5ddb0c179 |
#1 Adminstrative Approval Group | Henry Egland - 02/28/2022 12:39 PM 78415792609c6cfab29647a8ae0bddb1 612ac4916b2710a8f591893a0f0ecdc9 |
#2 Inspector Group | Henry Egland - 02/28/2022 12:39 PM a24e4bfe3e7ee51046b75febeab1f10f 721ca300cbc6c19e1facbe4a8f5ec931 |
#3 Level Three Final Action | Molly Oestreich - 03/01/2022 8:31 AM c27d7c4b4c9b9feff2cfd597629ae7fa edc57c98c8c8b7cb734ad61bb3eae64e |
Public Notes
Text: | Permit #46718. Approved for 10'x10' Accessory structure. Not for Commercial Use. Not for Human Habitation. |
File(s): |
|
Admin Checklist
Date application was complete: | 02/27/2022 |
Review started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | Yes |
Inspector Checklist
Zoning Inspector: | |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? |