Land Alteration Permit # 2022-7688, App. # App-2022-008491, UID # 204639
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Joe W Emery
Phone:
(218839 - 3965
Email Address:
emeryhydroseeding@charter.net
Mailing Address:
904 Porcupine Trl
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(763486 - 0405
Property Owner Email Address: muelhy66@gmail.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
07-1-12440028974 442nd Pl
AITKIN, MN 56431
FARM ISLAND TWPPOINT OF VIEWS:29 T:46 R:27RDFARM ISLAND LAKEMUELHBAUER, GERALD & PAMELA TRUSTEEMUELHBAUER, GERALD & PAMELA TRUSTEE
Driving directions to the property from Aitkin.:
Hwy 169 South to CR 28 West to 442nd South to property address

Project Description

Please describe your proposed project:
Repair existing rip rap along shoreline
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Rock
Total Amount of Excavation and/or Fill proposed? (cubic yards) 24 CuYd
Total Area to be Graded and/or Filled? (L x W) 480 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Other (explain below)
If other, please explain:
Winter work
Describe how you intend to implement this plan
and your finished vegetation plan.:
We will be doing this work from the ice so no soil will be disturbed

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #54465 (02/03/2022)

Charge Cost Quantity Total
Non-Taxable
added 02/03/2022 7:55 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 02/03/2022$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJoe W. Emery - 02/03/2022 7:56 AM
398397cb5b45ce5af66b2ca274aa222d
2aa7189f6263dcf50d2835b894c4f186
 
#1 Adminstrative Approval GroupHenry Egland - 02/03/2022 7:59 AM
a3453cbc5637ba1b4cc9dd4708618dbc
144b09ffd41a44f3eabd5dff588cb4e2
 
#2 Inspector GroupHenry Egland - 02/14/2022 12:15 PM
e21b274e3a9c899776ead572d41380e9
b68aac92f4a581a785444c168de798f6
 
#3 Final ActionMolly Oestreich - 02/14/2022 12:28 PM
06565faa963cfacc17d00a18e77f74a7
89bb5624e1551275a23880fc546a2562
 
Application has been approved. All signatures have been obtained.
Text:
Permit #46712. Approved for Rip-Rap repair.

*Rip-Rap not to exceed line indicated on site photos.
File(s):
Text:
File(s):
    Date application was complete: 02/03/2022
    This review has been started by: Henry Egland
    Zoning District of project location: Shoreland
    Zoning Inspector:
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone?
      Was an onsite conducted for this application?
      Is this an After-The-Fact application?
      Project located in the floodplain?
      Base Flood Elevation:
      Powered by