OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | ted@5energy.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | south on HWY 169 to Ditch Bank road east to 388th place to address |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | new one and 2 story home with attached garage and partial basement. We will be behind the 100 foot setback and removing the existing non conforming cabin and shed to construct a 5050Sf dwelling that is not uniform dimensions see attached.The Main level is 3770 sf including the screen porch with an attached 1280sf garage |
What is the height of your structure? | 30 Feet |
Project Type
Item 1 - Structure Type: | New Residence incl. attached decks/porches/garages |
Item 1 - Size: | 5050 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 100 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 150 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 30 Feet |
What percent slope of the land currently exists on the project site? | 2 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Hydro seedin |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
Invoice #54311 (12/07/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 12/07/2021 4:28 PM $550 Flat Fee |
$550.00 | x 1 | $550.00 |
Grand Total | |||
Total | $550.00 | ||
Payment 12/07/2021 | $550.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Dale Grandt - 12/08/2021 2:53 PM - witnessed by Shannon Wiebusch 43d0ba500c1b707e69ed38d20643cc34 eef84b7a5830d632a01b894bfb9e3909 | |
#1 Adminstrative Approval Group | Shannon Wiebusch - 12/23/2021 9:44 AM 7427bd8cfaa80177ba389e9b7766d172 ae2c193221a03fc074394f7748e4dd76 | |
#2 Inspector Group | Henry Egland - 01/03/2022 9:56 AM 6d3d962f494b4dd82af9ab7e05f8486a 8406b3beb20a0287140acb918ae70572 | |
#3 Level Three Final Action | Molly Oestreich - 01/03/2022 10:10 AM 1e2a12d809687d0f6df8348fd2e66675 eabfceb6531c29cbbd17fb7203dec147 |
Text: | Permit #46688. Approved for 5050 sq/ft New Residence. Conditions: Septic design and application to be submitted by June 1st, 2022 Larry Liljenquist is designing new system in the spring; CI on existing system on file. The new house might encroach on the existing drainfield. sw $350 to be refunded for septic. sw Refund issued 12/10/21 Kb ($350) |
File(s): |
|
Text: | Kevin was going to talk to larry about septic design and I will quick check to see if setbacks are met. - H.E. Also have to look at encroaching shed issue per Becky's email. |
File(s): |
|
Date application was complete: | 12/08/2021 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 100 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | Yes |
Septic Tank setback appears to be met with/without an engineer's report? | |
Septic Drainfield setback appears to be met with/without an engineer's report? | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |