OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | mayers7@me.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | PID 340041100 1 driveway south of assigned address 11500 110th Ave Finlayson MN |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | No |
Project Description
Please describe your proposed project: | Shed 40x80x14'walls |
What is the height of your structure? | 22 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 3200 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
Invoice #54303 (12/02/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 12/02/2021 9:40 AM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 12/06/2021 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Craig Skaff - 12/02/2021 9:40 AM 2bccf75f2807a95a295f63cf89b32182 fe243cfbd3d5d7260e8d426a64f77cef | |
#1 Adminstrative Approval Group | Henry Egland - 12/06/2021 8:18 AM 3523407fa73839dc5efa68739b9f6c03 b4730b9ee0cfa8fa3e0f594fbaa39328 | |
#2 Inspector Group | Henry Egland - 12/06/2021 3:53 PM c68205ca6f6210de732d12f0b01b867f 5c0c18cfe64cd8c6adfcd179d21bb90d | |
#3 Level Three Final Action | Molly Oestreich - 12/07/2021 8:53 AM b4775bef8e24abbaf2a80b71204b167d fd298f6135202faa62d79d637c084b6c |
Text: | Permit #46650. Approved for 40' x 80' Accessory structure. Condition: Storage box on adjacent parcel 34-0-041200 to be removed when approved accessory structure is built. |
File(s): |
|
Text: | I have been working with this landowner - H.E. |
File(s): |
Date application was complete: | 12/06/2021 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |