Land Use Application Permit # 2021-7577, App. # App-2021-008348, UID # 204364
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Ronald Leone
Phone:
(612501 - 9971
Email Address:
brenda.l.leone@gmail.com
Mailing Address:
5870 147th LN NW
Ramsey MN 55303
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
35-1-07850049482 385th Pl
PALISADE, MN 56469
WAUKENABO TWPSUNRISE SHORESS:17 T:49 R:26RDROUND LAKE (WAUKENABO TWP)LEONE, RONALD A JRLEONE, RONALD A JR
Enter directions to the property (if no property address assigned):
N169  left on CR3
Right on 496th LN
Right on 385th Place
#49482 on left
(Sunrise Shores on mail box)

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
50x80 Shed
What is the height of your structure? 20 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 4000 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 225 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 75 CuYd
How close to the property line will any fill be placed or any excavation be done? 20 Feet
What percent slope of the land currently exists on the project site? .5 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Seeding

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
Added Septic compliance
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Invoice #54194 (11/04/2021)

Charge Cost Quantity Total
Non-Taxable
added 11/04/2021 6:18 AM

$300 Flat Fee

$300.00 x 1 $300.00
Grand Total
Total $300.00
Payment 11/05/2021$300.00
Due$0.00

Approvals

ApprovalSignature
ApplicantBrenda L. Leone - 11/16/2021 10:25 AM
3f04c1cd14c2b57caa18983bb9e6f73f
f8168c737aac135f09cdb1aeafbcbcf4
#1 Adminstrative Approval GroupShannon Wiebusch - 11/16/2021 11:04 AM
b9b94e92786a69989650d0c67ef7519a
48fbc861b041f7209f09ef65bfa320fd
#2 Inspector GroupHenry Egland - 11/23/2021 11:31 AM
4d7d782c0a923ccbbc6f1028db954d99
8ddcf22621cda9bca2f938f927208612
#3 Level Three Final ActionMolly Oestreich - 11/23/2021 11:54 AM
f3873bee051defc375e14798c8fa4277
70c68b8f5c5a0e4eb70a92c993a9c2be
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #46634. Approved for 50' x 80' accessory structure. Not for commercial use. Not for human habitation.
File(s):

Admin Checklist

Date application was complete: 11/16/2021
Review started by: Shannon Wiebusch
Zoning District of project location: Shoreland
Required OWHL setback distance: 100 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector:
Attach necessary inspection forms/photos:
    Notes:
    Was an onsite conducted for this application?
    Powered by