OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Drive N on Hwy 169 about 30 miles turn left onto Cty Rd 7, in 3 miles at stop sign turn Right onto Osprey Ave/Cty Rd 29, property driveway is about 700' on left. Orange gate. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | No |
Project Description
Please describe your proposed project: | I am proposing to build a 20x24' garage. 10' sidewalls with a 4/12 pitched roof. This garage will be used for storage and vehicle parking. |
What is the height of your structure? | 14 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 480 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
Invoice #54156 (10/29/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/29/2021 12:39 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 10/29/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Janet M. Bahe - 10/29/2021 12:39 PM bba9c284fe4277ccf6863801b644e66a 6880408eeb3b679452953a313368c4cd |
#1 Adminstrative Approval Group | Shannon Wiebusch - 11/01/2021 9:00 AM c723aa1be7db26504f13bf3496d771e3 cc69fe5603cdac0659a067eed68f919b |
#2 Inspector Group | Molly Oestreich - 11/05/2021 9:15 AM 2233ad635bdfeab6225653fdcfd4df58 b2384766587589bbd779b59ae2cb05ec |
#3 Level Three Final Action | Molly Oestreich - 11/05/2021 9:23 AM 0c12d66344edb8478fdf59624c752cf9 34e6ae17b2241b18b9b5ac8d566dfbb2 |
Public Notes
Text: | Permit #46599. Approved for a 20' x 24' Accessory building. No Human Habitation, Not for commercial use. |
File(s): |
|
Admin Checklist
Date application was complete: | 10/29/2021 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Open |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Molly Oestreich |
Attach necessary inspection forms/photos: | |
Notes: | Meeting setbacks verified via GIS. Approved for a 20' x 24' Accessory building. |
Was an onsite conducted for this application? | No |