Land Alteration App. # App-2021-008309, UID # 204297
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
greg rono
Phone:
(218839 - 3371
Email Address:
randrsales@live.com
Mailing Address:
42880 260th Lane
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(612221 - 6481
Property Owner Email Address: marya16@comcast.net

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
07-1-08360044777 285th Ln
AITKIN, MN 56431
FARM ISLAND TWPREST-HAVEN BAYS:32 T:46 R:27RDFARM ISLAND LAKEANDERSON, MARY & PETER, TTEES, ETALANDERSON, MARY & PETER, TTEES, ETAL
Driving directions to the property from Aitkin.:
28 to partride to 285th ln

Project Description

Please describe your proposed project:
install rock native shubs approx 5ft to 70ft of rock
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Rock
Total Amount of Excavation and/or Fill proposed? (cubic yards) 10 CuYd
Total Area to be Graded and/or Filled? (L x W) 240 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
native plugs

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #54126 (10/25/2021)

Charge Cost Quantity Total
Non-Taxable
added 10/25/2021 5:59 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 10/25/2021$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantGreg Rono - 10/25/2021 5:59 PM
996c1f9329777207290c3bfeae405c79
7904aa7fc2e3fd2d6568e82f6f39bbdc
 
#1 Adminstrative Approval GroupHenry Egland - 10/26/2021 7:59 AM
d5f00f1ae9c44e68424a3632ffbcf647
4baab957043ca49f43932d9721675373
 
Application has been approved. All signatures have been obtained.
Text:
Permit #46565. Approved: Follow DNR rip-rap guideline; 

The MN DNR standards require  

a) the finished slope
does not exceed three (3) feet horizontal to one (1) foot vertical, 

b) the landward extent of the rip
rap is within ten (10) feet of the ordinary high water level, and 

c) the height of the rip rap above
the ordinary high water level does not exceed three (3) feet
File(s):
Text:
File(s):
    Date application was complete:
    This review has been started by:
    Zoning District of project location:
    Zoning Inspector:
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone?
      Was an onsite conducted for this application?
      Is this an After-The-Fact application?
      Project located in the floodplain?
      Base Flood Elevation: