OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Are you the Property Owner? | Yes | ||||||||||||||||||||||||||||||||
If we have questions on the application who should we contact? |
|
Project Location
Property Location: |
|
Driving directions to the property from Aitkin: | 169 south to cty rd 28 go east on 28 to 396th pl take left to 29380 396th pl |
Project Description
Please describe your proposed project.: | Remove a tree on the shoreline that is splitting that could land on dock and boats . Sam came to our house and gave the ok to cut it down . He suggested to cut in down in the winter. |
Vegetation Removal
Number of Trees to be removed: | 1 |
Number of Shrubs to be removed: | 0 |
Type of Clearing
Please select all that apply: | Mechanical Clearing Hand Clearing |
Please explain: | Tree will be cut with a chainsaw |
Required Attachments
Attach a copy of your plan drawing(s): |
|
Attach photo(s) of the area to be altered as it exists today: |
|
Additional Info
Additional attachments: |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Lawrence J. Peluf - 10/25/2021 9:21 AM 1306520d13675cf032020fd1c80d0fff 64aa103be72183c4da276f84896b963e | |
#1 Adminstrative Approval Group | Henry Egland - 10/25/2021 10:44 AM 7cb242f40a54e82a1f47ba759c526c6b b8c64648a87c4ac166fad83307fac2ed |
Text: | Permit #46564. Tree to be cut down in winter and stump has to remain after tree is cut down. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | |
This review has been started by: | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | |
Zoning District of project location: | |
Is this an After-The-Fact application? |
Zoning Inspector: | |
Attach any necessary inspection forms: | |
Was an onsite conducted for this application? |