OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | State Highway 47 turn on County Road four. Take a left on 3 135th Ln. driveway is approximately 300 feet before ATV trail |
Project Description
Please describe your proposed project: | 8 yards to fill in old basement from cabin we tore down Roughly 72 yards to fill-in for a future house Silt fence is put up |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Gravel |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 84 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 1200 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Silt fence is up plant grass in the spring |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #54075 (10/17/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/17/2021 9:31 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 10/28/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Chris C. Hagman - 10/17/2021 9:55 PM f1440b3b924b8c0480289c4ae67dd809 779634f555f66b5290443384ef24a0a4 |
#1 Adminstrative Approval Group | Becky Sovde - 10/28/2021 4:05 PM 2114c651e92dad6e4b5069aa04590c87 f5d335e2270e180f4951a69cc2c7443d |
#2 Inspector Group | Becky Sovde - 10/28/2021 4:06 PM 3462e6b5e3992ec50a40fbaf9a83f08c aa63cb4748dcdc75b2e0b4bba53823b4 |
#3 Final Action | Molly Oestreich - 10/29/2021 8:49 AM 5b355e2eef8220807e2e18e7097f7cde c5421a49ca817ce44948a0670d5b4708 |
Public Notes
Text: | Permit #46577. Approved for land alteration per plan and Landowner Statement. |
File(s): |
|
Internal Notes
Text: | |
File(s): |