OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | tvet@comcast.net |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 169 south rt on pioneer left on442end place house on left little red cabin. |
Project Description
Please describe your proposed project: | re rip rap, existing rip rap .reseed yard where necessary put down erosion control where necessary. . no excavation.10 yards of black dirt to be used to fix tracks from equipment. |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location of all driveways and/or access roads. Location and size of alteration. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 10 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 500 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
fix tracks from equipment with black dirt seed and straw blanket for erosion control. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53941 (10/03/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/03/2021 3:31 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 10/03/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | donald l. peterson - 10/03/2021 3:36 PM d0fa8f1186396a189eb82c786240a58d 2c9092e0de22c6470efed8aa23996970 | |
#1 Adminstrative Approval Group | Shannon Wiebusch - 10/04/2021 9:36 AM 0afa1a0369d94419523bb816d65aa366 3d60828d2a5804fd60929526273d2f80 | |
#2 Inspector Group | Henry Egland - 10/18/2021 8:41 AM 6aa6ec7c8a06e914467c469761f3a24c 2c058a505379852764b8a1dbbda90030 |
Text: | Permit #46568. Approved: Follow DNR rip-rap guidelines, plant 5' Native vegetation buffer spring 2022 |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 10/03/2021 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | |
Was an onsite conducted for this application? | |
Is this an After-The-Fact application? | |
Project located in the floodplain? | |
Base Flood Elevation: |