Land Alteration App. # App-2021-008215, UID # 204082
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Rick D Hohenstein
Phone:
(218678 - 9060
Email Address:
restoreme2u@yahoo.com
Mailing Address:
39130 state hwy 18
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(612462 - 4293
Property Owner Email Address: restoreme2u@yahoo.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
36-1-07530038983 240th St
AITKIN, MN 56431
WEALTHWOOD TWPTABINOON ADDITIONS:29 T:45 R:26GDMILLE LACSWILLS, CRAIG & COURTNEYWILLS, CRAIG & COURTNEY
Driving directions to the property from Aitkin.:
State Hwy 18 to 240th Street, go right.  38983 240th Street is on the right.

Project Description

Please describe your proposed project:
1. Set up silt fences - work done 1' above OHW
2. Remove Ice ridge to dimensions - cut dead tree and smaller ones out
3. Place rocks on shoreline to sides
4. Remove dirt to back lot area
5. Plant grass cover with straw on the 3 to 1 slope access 
6. Use wood fiber blanket and rocks on the side slopes, 1 to 1.
Will you be removing vegetation during this project? Yes

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Distance of alteration to OHWL (closest point)
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 1
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Mechanical Clearing
Hand Clearing
Please explain:
1. Set up silt fences - work done 1' above OHW
2. Remove Ice ridge to dimensions - cut dead tree and smaller ones out
3. Place rocks on shoreline to sides
4. Remove dirt to back lot area
5. Plant grass cover with straw on the 3 to 1 slope access 
6. Use wood fiber blanket and rocks on the side slopes, 1 to 1.

Excavation Details

Nature of Material to be used?
(Check all that apply)
Sand
Gravel
Boulders
Other (explain below)
If other, please explain:
Trees
Total Amount of Excavation and/or Fill proposed? (cubic yards) 28 CuYd
Total Area to be Graded and/or Filled? (L x W) 200 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
1. Set up silt fences - work done 1' above OHW
2. Remove Ice ridge to dimensions - cut dead tree and smaller ones out
3. Place rocks on shoreline to sides
4. Remove dirt to back lot area
5. Plant grass cover with straw on the 3 to 1 slope access 
6. Use wood fiber blanket and rocks on the side slopes, 1 to 1.

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #53906 (10/02/2021)

Charge Cost Quantity Total
Non-Taxable
added 10/01/2021 5:17 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 10/02/2021$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantRick D. Hohenstein - 10/02/2021 11:02 AM
c8f9f3588f0e9f9c0c49c6e4d1176936
a6e00fc1fd699dfdf2187dc573730180
 
#1 Adminstrative Approval GroupShannon Wiebusch - 10/04/2021 9:37 AM
881c8a680456cbb48c9b1e8797bec4c5
346204278e9a77c5236486c45793e96a
 
Application has been approved. All signatures have been obtained.
Text:
Denied, see attached email.

Refund issued 10/25/21 KB
File(s):
Text:
File(s):
    Date application was complete: 10/02/2021
    This review has been started by: Shannon Wiebusch
    Zoning District of project location: Shoreland
    Zoning Inspector: Henry Egland
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone?
      Was an onsite conducted for this application?
      Is this an After-The-Fact application?
      Project located in the floodplain?
      Base Flood Elevation:
      Powered by