Land Use Application Permit # 2021-7430, App. # App-2021-008145, UID # 204039
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Dale Alf Grandt
Phone:
(763268 - 9160
Email Address:
dale@grandtbuilders.com
Mailing Address:
43396 274th lane lot21
Aitkin mn 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Email: pjnolan67@gmail.com
Property Owner Phone:
(952210 - 2015

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
07-1-10680029976 436th Pl
AITKIN, MN 56431
FARM ISLAND TWPSHADY ACRESS:28 T:46 R:27RDLITTLE PINE LAKE (FARM ISLAND TWP)NOLAN, PATRICK & CARLANOLAN, PATRICK & CARLA
Enter directions to the property (if no property address assigned):
south on 169 to Pioneer west to 436th north to address

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
I am replacing the existing garage with a 26 x 28 2 story garage with storage above with toilet and sink and a 6 foot x 18 foot walkway and stair not roofed  to upper level.
What is the height of your structure? 26 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 728 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 175 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? Yes

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 50 CuYd
How close to the property line will any fill be placed or any excavation be done? 10 Feet
What percent slope of the land currently exists on the project site? 2 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Seeded and mulched

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #53864 (09/17/2021)

Charge Cost Quantity Total
Non-Taxable
added 09/17/2021 2:05 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 09/17/2021$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantDale A. Grandt - 09/17/2021 2:06 PM
47bcf488e90fbbbe0d64ca4179fa17d1
6c43e8c025815c638935daef1f167fde
#1 Adminstrative Approval GroupShannon Wiebusch - 10/06/2021 12:31 PM
0b0218ff61273d9a34302b7aa1090350
aa03dd500776544620334ee1d73a3f16
#2 Inspector GroupBryan Hargrave - 10/12/2021 9:12 PM
115431ac149eff9f97a18da05dce0442
dbf0fecf9ce8719d02d702ca42f6d9f5
#3 Level Three Final ActionKim Burton - 10/14/2021 2:00 PM
e047145dd9a6574421f67cb5a2ddf1e4
8d00d2c1fa2d99d5fb6c4d9eef4dfbf2
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit # 46532. Approved for a 28' x 26' detached garage replacing existing detached garage. Septic design needed to add proposed effluent useage to existing septic system.

CI rec'd 10/4. sw
File(s):

Admin Checklist

Date application was complete: 10/04/2021
Review started by: Shannon Wiebusch
Zoning District of project location: Shoreland
Required OWHL setback distance: 100 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Bryan Hargrave
Attach necessary inspection forms/photos:
    Notes:
    Meets all setback requirements. Approved for a 28' x 26' detached garage replacing existing detached garage. Septic design needed to add proposed effluent useage to existing septic system.
    Was an onsite conducted for this application? Yes