Land Use Application Permit # 2021-7363, App. # App-2021-008131, UID # 204020
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
bruce sutton
Phone:
(612269 - 1907
Email Address:
bsbs8@juno.com
Mailing Address:
11014 washingtion st ne
BLAINE mn 55434
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
14-0-04550141866 251ST PL
MCGREGOR MN 55760
JEVNE TWPS:27 T:48 R:24RDROCK LAKESUTTON, BRUCE & BECKYSUTTON, BRUCE & BECKY
Enter directions to the property (if no property address assigned):
hwy 210 west take a left on rock lake road
(255th place)take a right on 420th lane , take a rt at 251st place ,second place from the end.

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
Iam proposing to build a attached 30 feet by 22 feet garage , slab on grade to a existing cabin , our well and septic were installed last year by contractors ,the garage will have a 2 foot over hang,  we are using the same high water marker we used for the cabin permit. the garage will be on the north side of the cabin. 8 feet walls with a 4/12 pitch.
What is the height of your structure? 21 Feet

Project Type

Item 1 - Structure Type: Residence Addition
Item 1 - Size: 660 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 25 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 0 CuYd
How close to the property line will any fill be placed or any excavation be done? 30 Feet
What percent slope of the land currently exists on the project site? 1 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
some black dirt and grass

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? No

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #53852 (09/15/2021)

Charge Cost Quantity Total
Non-Taxable
added 09/15/2021 10:49 PM

$400 Flat Fee

$400.00 x 1 $400.00
Grand Total
Total $400.00
Payment 09/15/2021$400.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
Applicantbruce sutton - 09/15/2021 10:52 PM
d4c26567fa739879b3ec2ca0933c0733
d764faf5e41ffd27d7fd13f56a3561ee
 
#1 Adminstrative Approval GroupKim Burton - 09/16/2021 7:57 AM
e15a975212fa1058d0cc4cddf6a13bdd
05b7e8cb7b25d05f07aaeb5d01a4b690
 
#2 Inspector GroupBryan Hargrave - 09/27/2021 9:28 PM
6716a25a3010eb7a05139ddb7cbfde29
e774503a12f1cbc56f3e7fd94f7bb3f7
 
#3 Level Three Final ActionMolly Oestreich - 09/29/2021 10:19 AM
37c6446b5a356353284ffcb305ed8ae7
67f52f6df743e0efb09ff3ae766b876c
 
Application has been approved. All signatures have been obtained.
Text:
90 day extension issued to expire 12/29/22. sw 11/1/22
Permit #46484. Approved for a 22' x 30' attached garage.

applicant called; site is staked and ready. sw 9/20
File(s):
Text:
File(s):
    Date application was complete: 09/15/2021
    Review started by: Kim Burton
    Zoning District of project location: Shoreland
    Required OWHL setback distance:
    "Other" OHWL setback distance is:
    Project located in the floodplain?
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met?
    Road R-O-W setbacks appear to be met?
    Bluff setbacks appear to be met?
    Septic Tank setback appears to be met with/without an engineer's report?
    Septic Drainfield setback appears to be met with/without an engineer's report?
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Bryan Hargrave
      Attach necessary inspection forms/photos:
        Notes:
        Meets all setback requirements. Approved for a 22' x 30' attached garage.
        Was an onsite conducted for this application? Yes
        Self Install?
        Installer Name:
        None
        New Tanks:
        Existing Tanks:
        Date of Final Inspection:
        Attach Final Certificate of Installation:
          Low Interest Loan or SSTS Grant project?
          Powered by