OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | South on Minnesota Ave/169. Take a left to go East on 290th St. Take a left to go North on 400th Ave. Take a left to go West on 298th Ln. Property is second to last on the north side of the road. |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | No |
Project Description
Please describe your proposed project: | Proposed Use: Water Oriented Accessory Structure. I am proposing to build a 10x12 shed used to store tools, canoe paddles, life jackets. |
What is the height of your structure? | 10 Feet |
Project Type
Item 1 - Structure Type: | Water Oriented Accessory Structure |
Item 1 - Size: | 120 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 60 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 1 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 12 Feet |
What percent slope of the land currently exists on the project site? | 5 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
I will plant a variety of native shrubs and perennials (ex. dogwood, alder, elderberry, aster, joe pye weed, marsh milkweed) on the western and northern sides of the shed to shield the view of the shed from the neighbors and the lake and to enhance water capture and control erosion. |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | No |
Additional Info
Additional info: (optional) |
I will be able to stake the building site this Friday September 20, 2021. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53800 (09/20/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/20/2021 11:50 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 09/20/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Anthony J. Haas - 09/20/2021 11:50 AM fb1f799edf3748843201cb7311202c6a 10b9d5c9122d0bff88bfeba5410c87dc |
#1 Adminstrative Approval Group | Kim Burton - 09/20/2021 12:20 PM 4e16af5a018a02562d760ca55061c901 e07ffc034565ae487876f52576b9c8dc |
#2 Inspector Group | Bryan Hargrave - 10/03/2021 4:17 PM df8be39dec3df3fc5e0e5f77f441f023 ed440949ef68a3b36b3d1a25b4c5205b |
#3 Level Three Final Action | Molly Oestreich - 10/04/2021 8:27 AM faa869049c7ba3013287b49deb90cfdf a091ba2c4fa523b0b2253a0510d59ab0 |
Public Notes
Text: | Permit #46493. Approved for a water oriented accessory structure (10' x 12') 50' from property line and 25' from OHW. |
File(s): |
|
Admin Checklist
Date application was complete: | 09/20/2021 |
Review started by: | Kim Burton |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | |
Road R-O-W setbacks appear to be met? | |
Bluff setbacks appear to be met? | |
Septic Tank setback appears to be met with/without an engineer's report? | |
Septic Drainfield setback appears to be met with/without an engineer's report? | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: | |
Notes: | Meets all setback requirements. Approved for a water oriented accessory structure (10' x 12') 50' from property line and 25' from OHW. |
Was an onsite conducted for this application? | Yes |