OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | 169 north to Hill City. Turn East on Hwy 200. Go to Hwy 65. Turn north on Hwy 65. Go 1 mile. Turn east on Hwy 200 approx. 4.5 miles. Turn south on 154th Pl. Go 1/4 mile. Property on the east,. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | No |
Project Description
Please describe your proposed project: | We are building 2- 20x30x12 hoop buildings just west of the 24x40 building that is already located there. They will be used for storage. |
What is the height of your structure? | 12 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 600 ft2 |
Item 2- Structure Type (if applicable): | Accessory Building |
Item 2 - Size: | 600 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53798 (09/27/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/27/2021 8:59 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
added 09/27/2021 8:59 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 09/27/2021 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | online submittal - 09/27/2021 9:02 AM - witnessed by Kim Burton 3af47b4233f28fa5cae66bba56c080ae 9a431975dd761766d25450de1a04be38 |
#1 Adminstrative Approval Group | Kim Burton - 09/27/2021 1:38 PM 0c2f4e6c2b16a63fd182b6d36f292127 391ac089e7f39dd67dbab12ab35b455a |
#2 Inspector Group | Kevin Turnock - 09/27/2021 3:16 PM 8767fc32da7b8bf5ab556d63135effc2 12bed5e9e9b55f27d168aedf24e3aa40 |
#3 Level Three Final Action | Molly Oestreich - 09/27/2021 3:30 PM ad0c8f5dafb23d049bab2daec68deb27 bc3e4487f2d618bedf8e2aba087fca29 |
Public Notes
Text: | Permit #46476. Approved for 2 20' x 30' accessory structures. No human habitation or commercial use. |
File(s): |
|
Admin Checklist
Date application was complete: | 09/27/2021 |
Review started by: | Kim Burton |
Zoning District of project location: | Public |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | |
Road R-O-W setbacks appear to be met? | |
Bluff setbacks appear to be met? | |
Septic Tank setback appears to be met with/without an engineer's report? | |
Septic Drainfield setback appears to be met with/without an engineer's report? | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Kevin Turnock |
Attach necessary inspection forms/photos: | |
Notes: | Approved per GIS review |
Was an onsite conducted for this application? | No |