OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | randrsales@live.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 47 to 292ln |
Project Description
Please describe your proposed project: | remove rock install fabric reinstall rock |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 10 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 240 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
grass |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53706 (09/01/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/01/2021 9:36 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 09/01/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Greg Rono - 09/01/2021 9:37 AM 0e985dc3b808699c8858a48c758cd666 195111fef387db4173de4fb61fdb4acf | |
#1 Adminstrative Approval Group | Becky Sovde - 09/07/2021 2:02 PM f33a02925e6738e6425d28f808c3ba36 3d7b6ba2888a5d20a0b5d58cd52b76db | |
#2 Inspector Group | Becky Sovde - 09/07/2021 2:03 PM 522d21bfc71fe6fa5d4aab786e990d8b 893cb7428b075d36640414c2e6a68f81 | |
#3 Final Action | Molly Burman - 09/07/2021 4:23 PM b2832c1615660b65693a06a4dca49b60 19d98e8c26f1c74f258dd120bc2189ad |
Text: | Permit #46408. Approved for rip rap land alteration. Condition of Permit: Implement details and conditions listed in the Pauly Permit Conditions document. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 09/01/2021 |
This review has been started by: | Becky Sovde |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Becky Sovde |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | |
Base Flood Elevation: |