Land Alteration App. # App-2021-008159, UID # 203843
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Benjamin M Smith
Phone:
(715293 - 7150
Email Address:
bms.smith777@gmail.com
Mailing Address:
253 Richmond St W
South St Paul MN 55075
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(651210 - 3024
Property Owner Email Address: charhealyaz@hotmail.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
07-1-149600FARM ISLAND TWPBLUE RIDGE ESTATESS:4 T:46 R:27NEBLUE LAKEHEALY, CHARLOTTE TRUSTHEALY, CHARLOTTE TRUST
Driving directions to the property from Aitkin.:
-Head West on MN-210 W/2nd St NW toward 4th Ave NW
-Turn Left onto Pioneer Ave
-Turn Left onto 339th Ln
-It will be on your right
-It is the 2nd from last lot on the street.

Project Description

Please describe your proposed project:
We would like to add a road onto the property and clear out an opening at the end of the road for camping. The site drawings indicate the exact location for the road and camping area in relation to the property lines. We plan to put down some black dirt and class 5 gravel where needed for the road and leave as much as possible just as a grass road. We don't plan to do any grading, but instead just fill where needed to create a smooth driving surface. The camping area would just be grass.

We plan to use around 33 yards of dirt and 6 yards of class 5 gravel.

We will implement erosion logs during the fill process if any of the black dirt is exposed for any length of time.
Will you be removing vegetation during this project? Yes

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 20
Number of Shrubs to be removed: 15
Type of Clearing Used?
(Check all that apply)
Mechanical Clearing
Hand Clearing
Please explain:
A chainsaw will be used to cut trees. Shrubs will be pulled, if possible, or cut with a heavy duty weed whip. Stump grinder will be used to get stumps below ground level.

Excavation Details

Nature of Material to be used?
(Check all that apply)
Black Dirt
Gravel
Total Amount of Excavation and/or Fill proposed? (cubic yards) 39 CuYd
Total Area to be Graded and/or Filled? (L x W) 540 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Other (explain below)
If other, please explain:
Could also be erosion logs. Whatever is most easily available.
Describe how you intend to implement this plan
and your finished vegetation plan.:
1. Clear trees and shrubs within indicated road and camping area.

2. Grind any stumps below ground level with gas powered stump grinder.

3. We plan to fill where needed with black dirt and class 5 gravel. The only area that will need dirt and gravel is the approximately 36' area from the 339th Lane through the ditch on the side of the road and up onto the higher section of the lot. This area will be filled with approximately 20" of black dirt and then 4" of gravel on top of that. every 4" of fill we will pack with either a gas powered tamper or a hand tamper. Proper drainage will be added in this section of road if required.

4. The remainder of the access road past the initial ditch section off of 339th Lane will be just a grass road. The camping area will also be just grass. we may do a little seeding where necessary on grass area of road and camping area.

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #53678 (09/21/2021)

Charge Cost Quantity Total
Non-Taxable
added 09/21/2021 11:27 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Due$200.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantBenjamin M. Smith - 09/21/2021 11:27 AM
7c8ae9bc98c650d2a5bcbec89842e1c3
165ea9b1e736854c0f463d169e4accdc
 
#1 Adminstrative Approval GroupShannon Wiebusch - 09/27/2021 3:33 PM
6f9e59bc03ddde94a68828683ba98de6
1f5bca4f141febb8f6e59226b841a484
 
Application has been approved. All signatures have been obtained.
Text:
Denied- Did not have center line of road staked and property line flagged. Could not proceed with application.

payment transferred to app 2021-008394 KB
File(s):
    Text:
    Talked with Ben on 10/19/21. He is going to call when he has the proposed road staked out and the property line marked out. - H.E.
    
    payment transferred to app 2021-008394 KB
    original receipt attached below
    File(s):
    Date application was complete: 09/27/2021
    This review has been started by: Shannon Wiebusch
    Zoning District of project location: Shoreland
    Zoning Inspector: Henry Egland
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone?
      Was an onsite conducted for this application? Yes
      Is this an After-The-Fact application?
      Project located in the floodplain?
      Base Flood Elevation:
      Powered by