Land Use Application Permit # 2021-7278, App. # App-2021-007994, UID # 203782
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Dan Hennessy
Phone:
(763442 - 4601
Email Address:
dshennessy@mac.com
Mailing Address:
13130 Coral Sea Court NE
Blaine MN 55449
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-540800SHAMROCK TWPPINE HAVEN ESTATESS:19 T:49 R:23RDSANDY RIVER LAKEHENNESSY, DANIEL & ROCHELLEHENNESSY, DANIEL & ROCHELLE
Enter directions to the property (if no property address assigned):
Head North on HWY 169 for about 8.2 miles

Turn Right on MN HWY 210 for about 14.18 miles

Turn Left on MN 65 for about 7.98 miles 

Turn left on 216 Place. (Zorbaz will be on the right)

The lot is on the right (lake side) the lot south of us is having a log cabin built on in.

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? Yes
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
Pole Building to store our watercraft, atvs and other personal items. 

Size: 30' x 40' and 16' ceiling

Distance from property line = 31'
Distance from road = 85'

24" o.c. Eave Studs
4' o.c. Trusses
36" S. Door
What is the height of your structure? 20 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 1200 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 400 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 200 CuYd
How close to the property line will any fill be placed or any excavation be done? 30 Feet
What percent slope of the land currently exists on the project site? 9 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Planting and retaining walls if needed

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
Markers and Stakes are in place for  inspections.

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #53621 (08/24/2021)

Charge Cost Quantity Total
Non-Taxable
added 08/24/2021 11:53 AM

$300 Flat Fee

$300.00 x 1 $300.00
Grand Total
Total $300.00
Payment 08/24/2021$300.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantRochelle J. Hennessy - 08/31/2021 5:04 PM
c96dc2ecb710b81c9aa72e24f3d563bb
7c1a31b8e265e36e395b0fa8b7802758
 
#1 Adminstrative Approval GroupKim Burton - 09/01/2021 12:44 PM
f19466e7186823eb6b16a9477b4fa5d3
ca5356444c47acacc8517aba1da9e1e4
 
#2 Inspector GroupBryan Hargrave - 09/13/2021 9:01 PM
7270b5ec0d41c3da5870a0164448a24f
6c1e3164512b2a2835eb1e39f2d3b194
 
#3 Level Three Final ActionMolly Burman - 09/15/2021 10:31 AM
4057561f0fa6b1cfb04dcc1fba5be315
2ed5ea3a4cd1e27a30994ab768dd1775
 
Application has been approved. All signatures have been obtained.
Text:
Permit #46432. Approved for a 30' x 40' pole building.

Distances to property lines and road needed on site drawing. KB
File(s):
Text:
File(s):
    Date application was complete: 09/01/2021
    Review started by: Kim Burton
    Zoning District of project location: Shoreland
    Required OWHL setback distance:
    "Other" OHWL setback distance is:
    Project located in the floodplain?
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met?
    Road R-O-W setbacks appear to be met?
    Bluff setbacks appear to be met?
    Septic Tank setback appears to be met with/without an engineer's report?
    Septic Drainfield setback appears to be met with/without an engineer's report?
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Bryan Hargrave
      Attach necessary inspection forms/photos:
        Notes:
        Meets all setback requirements. Approved for a 30' x 40' pole building.
        Was an onsite conducted for this application? Yes
        Self Install?
        Installer Name:
        None
        New Tanks:
        Existing Tanks:
        Date of Final Inspection:
        Attach Final Certificate of Installation:
          Low Interest Loan or SSTS Grant project?