OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | drbones195265@gmail.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | St Hwy 47 south the CR 4 East to CR 53 N to 299th S to 344th to 29907 |
Project Description
Please describe your proposed project: | Replace existing broken up boat ramp with new concrete slabs chained together with grass between |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Other (explain below) |
If other, please explain: | 10ea precast concrete slabs |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 10 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 300 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Floating Boom Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
floating boom in the lake then will seed and straw mulch disturbed area |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53603 (08/23/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/23/2021 1:55 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 08/23/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Joe W. Emery - 08/23/2021 1:56 PM ee4c29ea545d6f37e65ce2ba41771e80 03f3f539cbc30fe3939a0ccdcf4d7702 |
#1 Adminstrative Approval Group | Shannon Wiebusch - 08/24/2021 11:47 AM 5a7f3e1c5da5b8f1b137f2c69262fc60 6f974f4553ecbca5fdef9c11fb7a16a9 |
#2 Inspector Group | Sam Seybold - 08/25/2021 9:26 AM 60f14bbb1b9a23a6787e06a84cb5ec2c eab1c157fcf44ae936e2fbf1a26aa059 |
#3 Final Action | Molly Burman - 08/26/2021 2:24 PM 366003c352d824a704b11f2528d32773 cb892b0d6803333cc4953afe08032878 |
Public Notes
Text: | Permit #46373. Approved for replacement of old concrete slab with new precast concrete planks as per plan. |
File(s): |
|
Internal Notes
Text: | Replacing broken concrete slab boat ramp with precast concrete slabs to increase infiltration and vegetation onsite. ss |
File(s): |