OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | mapleridgeranch40@gmail.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Head west on MN 210, in 3 miles turn left onto Pioneer Ave, in 5.5 miles turn right onto Partridge Ave, in 2.2 miles turn left onto 285th Ln, destination will be on the left in 0.2 miles. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | Yes |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | Verizon proposes to construct a 250' self-support (no guy wires) tower with a 9' lightning rod, for a total height of 259', in order to improve the network for residents, visitors and emergency services in the surrounding area. The tower footprint will be cover approximately 40'x40' and associated ground equipment pad will cover a footprint of approximately 12'x30'. |
What is the height of your structure? | 259 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 1960 ft2 |
Site Plan
Attach Site Plan: | |
Is the site staked and ready for inspection? | Yes |
Additional Info
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53564 (08/19/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/24/2021 9:30 AM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 09/01/2021 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Donovan McCain - 08/24/2021 4:40 PM 1eee895bc7e2c260d635497ac57a983a e1f2fdd3547b6cfc7d9baf56ebfcfbde |
#1 Adminstrative Approval Group | Shannon Wiebusch - 09/01/2021 12:47 PM 7585457223628a4dcc5f5898044b74ae f128c73d2e051bab5aa50ecdbb38cbf8 |
#2 Inspector Group | Shannon Wiebusch - 09/13/2021 9:44 AM 050b64509ead4a45bd289ef3572e556d 53a2879aa0b3e9363ea7a857c2407379 |
#3 Level Three Final Action | Molly Burman - 09/13/2021 12:59 PM 0d8a87d98778bdaa0a5d5036ac18f4ef 3d5d536fcd9ceaea419e515032fec469 |
Public Notes
Text: | Permit #46425. Approved for a 259' self-support telecommunications tower and associated ground equipment pad in a 1,960 sqft footprint per CUP# 46228C |
File(s): |
|
Admin Checklist
Date application was complete: | 09/01/2021 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Kevin Turnock |
Attach necessary inspection forms/photos: | |
Notes: | onsite conducted for CUP |
Was an onsite conducted for this application? | No |