Land Alteration Permit # 2021-7191, App. # App-2021-007916, UID # 203652
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Gary Paul Scholzen
Phone:
(763607 - 7420
Email Address:
gary.scholzen@gmail.com
Mailing Address:
PO Box 304
Hill CITY Mn 55748
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
12-0-01910168326 US HWY 169
HILL CITY, MN 55748
HILL LAKE TWPS:11 T:52 R:26GDHILL LAKE (HILL LAKE TWP)SCHOLZEN, GARY & PAMELASCHOLZEN, GARY & PAMELA
Driving directions to the property from Aitkin.:
Hwy 169 to address

Project Description

Please describe your proposed project:
Installing riprap following MnDNR requirements.. 
need to backfill riprap to support and secure it.
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location of erosion control measures.
Distance of alteration to OHWL (closest point)
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Sand
Gravel
Total Amount of Excavation and/or Fill proposed? (cubic yards) 60 CuYd
Total Area to be Graded and/or Filled? (L x W) 1000 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Other (explain below)
If other, please explain:
riprap is my erosion control. reeds and natural grasses will be on either side of riprap
Describe how you intend to implement this plan
and your finished vegetation plan.:
riprap professionally installed by lawn care contractor

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #53493 (08/16/2021)

Charge Cost Quantity Total
Non-Taxable
added 08/16/2021 9:55 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 08/16/2021$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantGary P. Scholzen - 08/16/2021 9:59 AM
80c14a6dd7d5bcbf3c8b9657c9867700
119ac09eda99751664a12d1dae15fa52
 
#1 Adminstrative Approval GroupShannon Wiebusch - 08/16/2021 12:30 PM
f26edb963e1640ba25797e36fb661f2f
9294fb5fb849c18d6fbfd604d16b5680
 
#2 Inspector GroupSam Seybold - 08/24/2021 9:46 AM
d727797e1c22f0c6cb09ae09b151d4f1
e08fce72202bc7e8d293bab0a2f11898
 
#3 Final ActionMolly Burman - 08/26/2021 1:26 PM
f2393c7b88fbb608fb31fc1021309fee
db3c01b5c57d02026871edce9fc52ada
 
Application has been approved. All signatures have been obtained.
Text:
Permit #46367. Approved for riprap installation below OHWL as DNR instructions.
File(s):
Text:
All the rip-rap to be installed below the OHWL as per DNR instructions. Heidi Lindgren (DNR Hydrologist) identified the OHWL for this installation.   ss
File(s):
    Date application was complete: 08/16/2021
    This review has been started by: Shannon Wiebusch
    Zoning District of project location: Shoreland
    Zoning Inspector: Sam Seybold
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone? Yes
      Was an onsite conducted for this application? No
      Is this an After-The-Fact application?
      Project located in the floodplain?
      Base Flood Elevation: