OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | colin.buechel@allenergysolar.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | 209 2nd St NW -Head east on 2nd St NW toward 1st Ave NW for 0.7 mi -Continue onto US-169N for 0.5 mi -Turn right onto 400th Ave for 0.6 mi -Turn left onto State Hwy 47 S for 5.3 mi -Turn left onto 350th Ave for 0.4 mi -Turn right onto 35374 350th Ave |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | Installation of a ground mounted solar PV system on the property. Total of 28 (370W) solar panels. |
What is the height of your structure? | 12 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 577 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53478 (08/12/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/12/2021 9:19 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 08/12/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Colin Buechel - 08/12/2021 9:19 AM c39463629a72291249a4873b8198b6e2 e615a139bfee6df44717c747576ba6cd |
#1 Adminstrative Approval Group | Kim Burton - 08/13/2021 11:55 AM 315780a1ee45e77ab4cb015bc21453d5 074b835ad73d78b9ee8f99e5dea2df3b |
#2 Inspector Group | Bryan Hargrave - 08/31/2021 10:19 PM 7a6e12ed24b66d3de93ce3506d799a51 ec2242c665b3513a4b0fa83b6bd5d8ce |
#3 Level Three Final Action | Kim Burton - 09/01/2021 9:35 AM f7088dc827926e3fbe21c2de89120900 fba416f07bcabf4c8b5b1a27b8531e43 |
Public Notes
Text: | Permit # 46393. Approved for a total of 28 solar panels. |
File(s): |
|
Admin Checklist
Date application was complete: | 08/12/2021 |
Review started by: | Kim Burton |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | |
Road R-O-W setbacks appear to be met? | |
Bluff setbacks appear to be met? | |
Septic Tank setback appears to be met with/without an engineer's report? | |
Septic Drainfield setback appears to be met with/without an engineer's report? | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: | |
Notes: | Site inspection done by GIS analysis. Meets all setback requirements. Approved for a total of 28 solar panels. |
Was an onsite conducted for this application? | No |