Land Use Application Permit # 2021-7328, App. # App-2021-008033, UID # 203595
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Kevin Kruta
Phone:
(763367 - 0044
Email Address:
kevkru6@q.com
Mailing Address:
3555 Constance Blvd NE
Ham Lake MN 55304
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
32-1-062700TURNER TWPBIG SANDY LAKE HIGHLANDS FIFTH ADDITIONS:34 T:50 R:23GDBIG SANDY LAKEKRUTA, KEVIN J & DARLA JKRUTA, KEVIN J & DARLA J
32-1-06280052755 186th Pl
MCGREGOR, MN 55760
TURNER TWPBIG SANDY LAKE HIGHLANDS FIFTH ADDITIONS:34 T:50 R:23GDBIG SANDY LAKEKRUTA, KEVIN J & DARLA JKRUTA, KEVIN J & DARLA J
32-1-062900TURNER TWPBIG SANDY LAKE HIGHLANDS FIFTH ADDITIONS:34 T:50 R:23GDBIG SANDY LAKEKRUTA, KEVIN J & DARLA JKRUTA, KEVIN J & DARLA J
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
Hwy 169/210 North out of Aitkin to Hwy 210 East to Hwy 65 North (left) to Cnty 14 East (right) to Cnty 36 North (left) to 186th Place left to 52755 at the first corner is the lots.

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
I am proposing to build a 30 x 48 accessory building with 2' side overhangs and 1' front and back overhangs.  Removing the exsiting 12' x 24' building.

The existing Holding Tank was compliant 3 1/2 years ago, was pumped last November and has not been used since.  See attached pumping receipt.

The septic plan will be submitted and the 2 shallow wells on the property will be sealed in 2022 and  when cabin structure application is submitted.
What is the height of your structure? 20 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 1440 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 200 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 60 CuYd
How close to the property line will any fill be placed or any excavation be done? 30 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Planting of vegetation after completion of building.

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
Spoke to Kevin in Zoning about the existing Holding Tank and Wells on site, advised to attach the tank pumping receipt and holding tank compliantcy test from 3 1/2 years ago. Also stated to note that the septic Holding Tank and Wells will be addressed in 2022 when cabin structure application is submitted.
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #53443 (08/30/2021)

Charge Cost Quantity Total
Non-Taxable
added 08/24/2021 8:36 PM

$300 Flat Fee

$300.00 x 1 $300.00
Grand Total
Total $300.00
Payment 08/30/2021$300.00
Due$0.00

Approvals

ApprovalSignature
Applicantonline submittal - 09/01/2021 12:18 PM - witnessed by Kim Burton
be2f8bee6a8e27de182877f6f25bd23f
fabd6c5372eb3bf8895e462c5719c6aa
#1 Adminstrative Approval GroupKim Burton - 09/01/2021 12:18 PM
adf628bd21ee0648f3432bf72b79dfa0
ccebacc8511b9172d3c1deaa8b081cf5
#2 Inspector GroupBryan Hargrave - 09/21/2021 8:46 PM
858142f2697844cba1b55623f0cc932c
f33e84db287fdf1d604a23fedf2628a2
#3 Level Three Final ActionMolly Oestreich - 09/22/2021 10:11 AM
ed5276af687a6e935a6fc739a3fbd0db
c442fccda9ea1ffc605b72410bc89969
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #46457. Approved for a 1440 sf accessory structure.
File(s):

Admin Checklist

Date application was complete: 09/01/2021
Review started by: Kim Burton
Zoning District of project location: Shoreland
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain?
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met?
Road R-O-W setbacks appear to be met?
Bluff setbacks appear to be met?
Septic Tank setback appears to be met with/without an engineer's report?
Septic Drainfield setback appears to be met with/without an engineer's report?
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Bryan Hargrave
Attach necessary inspection forms/photos:
    Notes:
    Meets all setback requirements. Approved for a 1440 sf accessory building located as shown on the submitted site plan.
    Was an onsite conducted for this application? Yes
    Powered by