OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | 169 North towards HIll City, left on Grove Street, Grove Street turns into Osprey Ave, continue straight. 496th Lane is the first right after Hilltop Chapel. House is the third driveway on the right on 496th Lane. |
Does your property have an E911 address assigned? | Yes |
Septic Type
Select the system you are applying for: | Residential Bed (Type 1) |
Design Information
Attach Septic Design & Management Plan: | |
Designer Name: |
None
|
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #53369 (08/03/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/03/2021 8:26 AM | $300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 07/28/2021 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Daniel Joseph Curtiss - 08/03/2021 8:29 AM - witnessed by Shannon Wiebusch df4b06e7450f175776b42e9cc98c129f c4eb0a998d8956f6ae1a43bfd7cfb0bc |
#1 Adminstrative Approval Group | Shannon Wiebusch - 08/03/2021 8:42 AM cf4506dfc2cd9459f639d0ff1973087f 912d7b625e6a11f0ff291fd6bf2cdf95 |
#3 Final Approval | Molly Burman - 08/04/2021 2:04 PM db50487e150f163bf54fd08363213905 d1e919f00df0a670c30ca4d0cd8998d0 |
#2 Inspector Group | Shannon Wiebusch - 08/04/2021 9:27 AM 331d73e57f33ed71efc072ea1a7e02d7 579e60ed87b0de63c2fc07930ca39cd5 |
Public Notes
Text: | Permit #46285. Approved for a 3 bdrm Type I pressure bed septic |
File(s): |
|
Admin Checklist
Date application was complete: | 07/28/2021 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Open |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | No |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
DESIGN REVIEW CHECKLIST
Design Reviewed By: | Kevin Turnock |
SSTS Type: | Type I |
SSTS Design: | Pressure Bed/Seepage |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 3 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |