OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | ralphdtellefsen@cs.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 169 to 5 to 438th |
Project Description
Please describe your proposed project: | fix rip rap built erosion wall |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 20 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 240 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
native shrubs |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53258 (07/23/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/23/2021 12:55 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 07/23/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Greg Rono - 07/23/2021 12:55 PM 10591e9ba6486f2afc5dfa7a3883698d 33dcb826ffb3b9710a5cd72cee22192f | |
#1 Adminstrative Approval Group | Shannon Wiebusch - 07/28/2021 2:43 PM a80b6027da1b94b0046300f2d46f2e12 3c30349e959044eb061ad8217f726e88 | |
#2 Inspector Group | Sam Seybold - 07/28/2021 3:15 PM dc9139c00b72ce7eb8e568c6dc65594b 341f6217f1ac221bf3ac5e9c74867a37 | |
#3 Final Action | Molly Burman - 07/29/2021 9:27 AM befa1c786ec424856861aa580d2e2f15 28ac08512b70d947d6a884223e1276d5 |
Text: | Permit #46268. Approved for maintenance of existing rip-rap and the addition of a water diversion structure. |
File(s): |
|
Text: | Maintenance on existing rip-rap and re-sloping part of the bank with a water diversion wall to prevent ongoing erosion. ss |
File(s): |
Date application was complete: | 07/23/2021 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Sam Seybold |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | |
Project located in the floodplain? | |
Base Flood Elevation: |