Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | 169 North 210 East to McGregor 65 North Country Road 36 East to Wakefield Lake |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | 22'x36'x8'4" ceiling accessory building used for garage and storage |
What is the height of your structure? | 12.9 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 792 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 200 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 150 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 10 Feet |
What percent slope of the land currently exists on the project site? | 4 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
vegetation planted after construction |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
Structure to be installed by Sherman Pole Buildings We are available if you need to make a site visit (contact us 651-257-2963) Site will be 200+ feet from lake, 10 feet from property line and 20 feet from septic |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
|
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53145 (07/26/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/13/2021 12:11 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 07/26/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Cathy Rochel - 08/09/2021 10:12 AM - witnessed by Shannon Wiebusch 8d4403160ea5afe466ef276b748334bf 68468380eedeb9a75a4e3464d1973a33 | |
#1 Adminstrative Approval Group | Shannon Wiebusch - 08/09/2021 10:17 AM 41cd54dd9094cd48928c1f7f928078e4 065e10f4a4b1023b75de926ad613fcee | |
#2 Inspector Group | Bryan Hargrave - 08/19/2021 4:29 PM 4d69577fb31916df9f8faec6a4ff3a33 9e42037988ad4be13889371604dc8c23 | |
#3 Level Three Final Action | Molly Burman - 08/20/2021 10:29 AM 1249324b52dd365d7386f0c8973bb5f4 ed8774daecc6c58948e6cb8e50d292db |
Text: | Permit #46347. Approved for a 22' x 36' garage. |
File(s): |
|
Text: | Septic inspection required. Kb rec'd 8/9/21 sw |
File(s): |
Date application was complete: | 08/09/2021 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 150 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: | |
Notes: | Site inspection done by GIS analysis. There are no setback or wetland issues. Approved for a 22' x 36' garage. |
Was an onsite conducted for this application? | No |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |