OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 65 north left on Lake Avenue right on HGWY 36 left on 532nd to property |
Project Description
Please describe your proposed project: | project consists of shoreline repair of rip rap, stone steps installed to dock and 2 tiered retaining walls on south side of lot. RIP RAP - 100 feet of shoreline 6 Tons - Rock for rip rap 5 Ton- Rock Steps 18 yards of black dirt - for regrowing natural buffer between yard and lakeside Retaining Walls 40 yards of rock for walls 20 yards fill dirt 5 tons stone steps 15 yards of black dirt fabric native plants - perennials erosion control blankets and erosion control booms used to control erosion |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location and size of alteration. Location of erosion control measures. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Rock Boulders |
If other, please explain: | RIP RAP - 100 feet of shoreline 6 Tons - Rock for rip rap 5 Ton- Rock Steps 18 yards of black dirt - for regrowing 20 ft natural buffer between yard and lakeside 2 Retaining Walls 40 yards of rock for walls 20 yards fill dirt 5 tons stone steps 15 yards of black dirt |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 33 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 2600 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching Tree Planting Rain Garden |
Describe how you intend to implement this plan and your finished vegetation plan.: |
20 foot natural buffer of native plants across entire 100 ft shoreline will control erosion long term. we will also be adding in at least 4 trees to the lakeside yard. tree on shoreline in photos will stay in place. the project goals are to regain native habitat/vegetation and control erosion of shoreline via rip rap and add steps to the dock for safety. list of native plants we will use is attached. erosion blankets/straw bales will be used until native plants become established. |
Other Information
Other: | attached is septic compliance report from Farley inspection - May 2021 |
Other Attachments (optional): |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53055 (07/01/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/01/2021 10:40 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 07/01/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Jennifer L. Marik - 07/01/2021 10:41 AM 4c92ad38ba589bf3738b6bbdd6be1631 d7cde22739b1e6d298ba2278d20ee5df | |
#1 Adminstrative Approval Group | Shannon Westerlund - 07/02/2021 12:06 PM a6048f7e2d88f37365860534b4e9f85c f74d65457b7085aa9e57d6b2b7ec95f4 |
Text: | Denied- The shoreline in question does not meet the criteria for installation of rip-rap as per Shoreland Management Ordinance 5.32 D. (6) Full Refund to be issued. Refund issued 7/15/21 KB |
File(s): |
Text: | |
File(s): |
Date application was complete: | 07/01/2021 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Sam Seybold |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | No |
Is this an After-The-Fact application? | |
Project located in the floodplain? | |
Base Flood Elevation: |