OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | Hwy 169 N for about 8 miles then turn RIGHT onto MN-210E, follow for about 14 miles, turn LEFT onto MN-65N, follow for about 7 miles, turn RIGHT onto Lake Ave (Sather's Store will be on the right corner at this intersection), follow for about 2.3 miles, turn RIGHT onto 490th St (Dirt Road), follow for 2 miles, turn RIGHT onto 185th Pl (Wild Oak Subdivision), first driveway on the LEFT (shared driveway... the driveway will split, but you stay going straight, as we are the house further back). 48912 - 185th Place |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | Proposing to build a shed, approximately 30x36 (15 feet high). |
What is the height of your structure? | 15 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 1080 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
No other information |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #52789 (06/07/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/15/2021 10:08 AM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 06/07/2021 | $200.00 | ||
Payment 06/16/2021 | $100.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Greg Neumann - 06/07/2021 9:49 AM e8cf14210a12201e667f2683fa451288 c52ba614af60f41fcb626c3ded685b2c |
#1 Adminstrative Approval Group | Kim Burton - 06/17/2021 8:06 AM 7132edd82dfe7e433b7b8e9f34e82036 d7b24245dc537c25744ef9f5cef3b0ba |
#2 Inspector Group | Kim Burton - 06/17/2021 8:06 AM 1aec67feb46a97dcc7bf5d1b70816f62 d5b75ad1c9fff1e6f7f7712de145004e |
#3 Level Three Final Action | Kim Burton - 06/18/2021 12:04 PM 72d3490d162b3c1c880c38e627d706f0 64a6006a2ebe6e3a6be00153b37c76d8 |
Public Notes
Text: | Permit #46108. Approved for a 30 X 36 accessory structure Bryan did onsite. Applicant wanted to upgrade from 30x30 to 30x36. Can approve after $100 payment is received. sw |
File(s): |
|
Admin Checklist
Date application was complete: | 06/07/2021 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Open |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? | Yes |