Land Alteration App. # App-2021-007257, UID # 202486
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Ian Halonen
Phone:
(605389 - 8285
Email Address:
halonencontracting@gmail.com
Mailing Address:
19508 SD-20
Meadow SD 57644
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(507951 - 0980
Property Owner Email Address: paul@knutsonplumbing.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
34-1-08040012347 104th Pl
FINLAYSON, MN 55735
WAGNER TWPWOODHAVENS:24 T:43 R:22RDPINE LAKE (WAGNER TWP)KNUTSON, PAUL & SUSANKNUTSON, PAUL & SUSAN
Driving directions to the property from Aitkin.:
south on 47 
east on 18, continue east 18 miles
south on 130th Ave
2 miles east on Alder St
3.1 miles south on 124th Ln
900 ft east on 104th Pl
60 ft on the south side of rd

Project Description

Please describe your proposed project:
Altering the site in preparation for a driveway and  new house site.  we will be removing topsoil in an area 150 feet wide by 300 feet long, then taking 5 foot of material form the higher half of stripped area and moving it to the lower end.  After common material is moved and compacted, topsoil will be respread and areas that have been disturbed will be seeded. Everything will be slopped and blended back to fit the landscape around it.  The driveway will be 250 feet long by 12 feet wide it will be cover with class 5.  Approx  4000 cubic yards will be moved to shape the site.  Approx 50 yards of class 5 will be imported for driveway.  Silt fence will be installed across the entire lake side of site.   It will remain up until new vegetation is established.
Will you be removing vegetation during this project? Yes

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 0
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Hand Clearing
Please explain:
no clearing necessary

Excavation Details

Nature of Material to be used?
(Check all that apply)
Black Dirt
Sand
Gravel
Total Amount of Excavation and/or Fill proposed? (cubic yards) 4000 CuYd
Total Area to be Graded and/or Filled? (L x W) 22500 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
silt fence will be installed, seeding will be done after grading is done.

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #52353 (05/06/2021)

Charge Cost Quantity Total
Non-Taxable
added 05/06/2021 11:10 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 05/06/2021$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantIan S. Halonen - 05/06/2021 11:11 AM
4d8486b6b3223512dc9d8c78f7d78cf8
55b7eb4f370ddeefc752e3b947570b4d
 
#1 Adminstrative Approval GroupShannon Westerlund - 05/07/2021 11:52 AM
80f8100c3f1e307ceb77abad874a3fc1
4758d62f53d7a6c5d122fa0b88b9f01a
 
Application has been approved. All signatures have been obtained.
Text:
Denied- Aitkin County Soil and Water rejected the proposed alteration for the following reason; "The large amount of excavation and fill (4000 yds) is reason for denial. We recommend that any future development be fitted to the site with far less excavation and or fill. The erosion possibilities and disruption of land within the shoreland is not keeping with the county Shoreland Ordinance." Also the vast amounts of excavation described might be detrimental to finding the required septic sites.

Refund issued 5/21/21 $200-$100 site visit. KB
File(s):
    Text:
    File(s):
      Date application was complete: 05/06/2021
      This review has been started by: Shannon Wiebusch
      Zoning District of project location: Shoreland
      Zoning Inspector: Sam Seybold
      Attach necessary inspection forms:
        Is the project in the Shore Impact Zone?
        Was an onsite conducted for this application? Yes
        Is this an After-The-Fact application?
        Project located in the floodplain?
        Base Flood Elevation:
        Powered by