OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | From McGregor drive north the County Rd 14, turn at Sather?s store go east and turn right on 490th street until you find 18947 |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | I am looking to build a 12x10 storage shed on skids so it can be moved if needed in the future. I plan on having 7? side walls as well. |
What is the height of your structure? | 8 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 120 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | No |
Additional Info
Additional info: (optional) |
I close on this property May 14th so after closing I would like to build this small storage shed. I plan to put this small shed near the existing cabin that is on the property already. I will not be disturbing any soils for this project nor will the building be placed in any low land on the property. It will be placed on the high ridge next to the existing cabin. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #52231 (04/15/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/15/2021 10:34 PM $50 Flat Fee |
$50.00 | x 1 | $50.00 |
Grand Total | |||
Total | $50.00 | ||
Payment 04/15/2021 | $50.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Jordan W. Moser - 04/18/2021 10:11 PM e9f90b274e2d04e6dca9feba97d79c0f e76f636f8416af2990b004e3903208f4 |
#1 Adminstrative Approval Group | Kim Burton - 04/20/2021 10:52 AM 808ceab71108d6925687779386ee5340 96ae4f46b04bdc7af7e4f585aa968bd3 |
#2 Inspector Group | Kevin Turnock - 04/20/2021 11:20 AM 0d26b14ba17d29e0bfdcbfa55e9d0d3f f00e9f628ded98eb0785efa5bc5a422b |
#3 Level Three Final Action | Karin Martinjako - 04/22/2021 8:44 AM 6047dea3bb46ab656b27aa900581227f c970389b7d8b2ae39426bf64e1c0034d |
Public Notes
Text: | Permit 45870. Approved for a 10x12 accessory structure. No human habitation or commercial use. |
File(s): |
|
Admin Checklist
Date application was complete: | 04/18/2021 |
Review started by: | Kim Burton |
Zoning District of project location: | Open |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Kevin Turnock |
Attach necessary inspection forms/photos: | |
Notes: | OTC per GIS map review. |
Was an onsite conducted for this application? | No |