OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | 169 to river road county road 10 |
Does your property have an E911 address assigned? | Yes |
Septic Type
Select the system you are applying for: | Residential Holding Tank (Type 2) |
Design Information
Attach Septic Design & Management Plan: | |
Designer Name: |
None
|
Pumping Agreement
Attach Signed Pumping Agreement: |
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License Number: | #1347 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #52229 (04/15/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/15/2021 5:37 PM | $200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 04/15/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | James P. Bebo - 04/15/2021 5:38 PM f7b79882ed70e554b83e0362d8e1d78c b3fcf2fa83893e365309d04592b50d59 |
#1 Adminstrative Approval Group | Shannon Westerlund - 04/16/2021 2:17 PM 910adaf7553b7f8b8fb8fae0342c7020 51cbc8c4611ea2b63e34690323ef5198 |
#3 Final Approval | Karin Martinjako - 04/22/2021 7:50 AM 99d7975b5ffd756014b3f8077efa5d16 9beb4a0270bb72851669e2efcc3946df |
#2 Inspector Group | Becky Sovde - 04/16/2021 3:46 PM a256dbd9b6b2d32556c656693885be45 f5dba00230c79238329bc4006ca202b7 |
Public Notes
Text: | Permit 45867. Approved for residential holding tank |
File(s): |
|
Admin Checklist
Date application was complete: | 04/15/2021 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Farm Residential |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | Yes |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
DESIGN REVIEW CHECKLIST
Design Reviewed By: | Becky Sovde |
SSTS Type: | Type II |
SSTS Design: | Holding Tank(s) |
New or Replacement SSTS: | New SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 2 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |