Land Alteration Permit # 2021-6412, App. # App-2021-007056, UID # 202166
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Mark Schlichting
Phone:
(763412 - 0392
Email Address:
janmarkslick@gmail.com
Mailing Address:
43322 conifer street
Aitkin MN 56431
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
11-0-07340043322 CONIFER ST
AITKIN MN 56431
HAZELTON TWPS:33 T:45 R:27GDMILLE LACSSCHLICHTING, MARK & JANETSCHLICHTING, MARK & JANET
Driving directions to the property from Aitkin.:
HWY 169 south east on hwy 18 right on Conifer street. to 43322 conifer street.

Project Description

Please describe your proposed project:
Driveway
16 ft base , 12 ft top ,400 ft long
100 yards of fill. with culvert at road. and replace existing culvert at pond
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Sand
Gravel
Total Amount of Excavation and/or Fill proposed? (cubic yards) 150 CuYd
Total Area to be Graded and/or Filled? (L x W) 400 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
plant grass along new driveway.

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #52041 (04/02/2021)

Charge Cost Quantity Total
Non-Taxable
added 03/31/2021 5:09 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 04/02/2021$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantMark S. Schlichting - 04/02/2021 10:08 AM
cd4ff2585a4250af79d7afe9d1b8d638
2255b9f5124354e2e76809f5191c8b60
 
#1 Adminstrative Approval GroupShannon Westerlund - 04/05/2021 9:06 AM
beb3bc34486c893ed48c9436d7297fc4
f81139a2b01742898e96597bada51fc8
 
#2 Inspector GroupSam Seybold - 04/19/2021 11:36 AM
0de13124fd1f3803e784e8157f8814ad
00577965143296c1fc0137bd63e0d1da
 
#3 Final ActionKarin Martinjako - 04/22/2021 8:09 AM
5434f1dd0cf58d2a0bd0667b9271e03a
e695f7831f72c39be20cd3559bbd0805
 
Application has been approved. All signatures have been obtained.
Text:
Permit 45868. Approved for 150 cubic feet of fill for road and culverts outside the shore impact zone.
File(s):
Text:
Fill outside of SIZ and outside the wetland delineation that was submitted by owner.
File(s):
    Date application was complete: 04/02/2021
    This review has been started by: Shannon Wiebusch
    Zoning District of project location: Shoreland
    Zoning Inspector: Sam Seybold
    Attach necessary inspection forms:
    Is the project in the Shore Impact Zone? Yes
    Was an onsite conducted for this application? Yes
    Is this an After-The-Fact application?
    Project located in the floodplain? No
    Base Flood Elevation:
    Powered by