OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | Hwy 210 east towards McGregor. Left turn onto Hwy 65, proceed north to Co Rd 14. Turn right onto Co Rd 14 (Lake Ave) proceed approximately 10 miles to Kestrel Ave; turn right onto Kestrel Ave. Follow Kestrel for approximately 3 miles to 145th Pl; turn right onto 145th Pl. Proceed on Kestrel Ave approximately 1/2 mile to 52511 on right. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | I am proposing to build a 10'x18' deck with no roof. |
What is the height of your structure? | 10 Feet |
Project Type
Item 1 - Structure Type: | Deck/Patio |
Item 1 - Size: | 180 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #51575 (12/15/2020)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 12/15/2020 11:38 AM $100 Flat Fee |
$100.00 | x 1 | $100.00 |
Grand Total | |||
Total | $100.00 | ||
Payment 12/15/2020 | $100.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | James E. Klosterman - 12/15/2020 11:39 AM f045aeb937340144b3c7b3736c883bf8 73eec33cefee4321a1ae2fe9b13955a9 |
#1 Adminstrative Approval Group | Shannon Westerlund - 12/17/2020 2:39 PM 38bda985636d50a243eb27bcafbc5c56 c111bd6a6379833d236fb92c3ee9b469 |
#2 Inspector Group | Kevin Turnock - 12/21/2020 10:45 AM 33b95a4f52dfdfb18b2fa39936b60999 93a7fbf2601260c5029040188dc522df |
#3 Level Three Final Action | Kim Burton - 12/21/2020 4:08 PM 5c590e16092891324addcf234fe3375a 9d82df7323f52d3735854fef5c31f01c |
Public Notes
Text: | Permit # 45726. Approved for a 10 x 18 deck. Not to be roofed or enclosed.KT |
File(s): |
|
Admin Checklist
Date application was complete: | 12/15/2020 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Kevin Turnock |
Attach necessary inspection forms/photos: | |
Notes: | GIS map review indicates all setbacks are being met. OTC. |
Was an onsite conducted for this application? | No |