Land Use Application App. # App-2020-006791, UID # 201639
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Robert J Johnson
Phone:
(651249 - 7692
Email Address:
dijo5455@hotmail.com
Mailing Address:
67051 185th Pl
Jacobson MN 55752
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
02-0-028506BALL BLUFF TWPS:15 T:52 R:23VANDUSE LAKE (BALL BLUFF)- BACK LOTJOHNSON, ROBERT J & DIANE TRUSTEESJOHNSON, ROBERT J & DIANE TRUSTEES
Does your property have an E911 address assigned? No
Enter directions to the property (if no property address assigned):
north on 169 to hwy 200 east, across hwy 65 to the first right turn which is 190th, go south to 672nd and turn left. Property is first on left on 185th Pl. House address is 67051 185th Pl across the street.

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
30' x 40' cold storage pole building.
What is the height of your structure? 12 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 1200 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 0 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 0 CuYd
How close to the property line will any fill be placed or any excavation be done? 30 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
plant grass

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #51536 (12/02/2020)

Charge Cost Quantity Total
Non-Taxable
added 12/02/2020 11:10 AM

$300 Flat Fee

$300.00 x 1 $300.00
Grand Total
Total $300.00
Payment 12/02/2020$300.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantRobert J. Johnson - 12/04/2020 1:02 PM
1bea53b319ea8984f8ba248922d383b3
2afaa212c2343b5e5c7f8e179c8d88c6
 
#1 Adminstrative Approval GroupKim Burton - 12/04/2020 1:08 PM
6a229991a6543f0926a0a84330de82cb
b90d7841e73b128f4cd93b75343626a4
 
Application has been approved. All signatures have been obtained.
Text:
Property zoned shoreland 
Denied permit-not able to meet ROW setback.KT
Refund issued 12/23/20 Kb
File(s):
    Text:
    File(s):
      Date application was complete: 12/04/2020
      Review started by: Kim Burton
      Zoning District of project location: Shoreland
      Required OWHL setback distance:
      "Other" OHWL setback distance is:
      Project located in the floodplain? No
      Base Flood Elevation:
      Lowest Floor Elevation:
      Is an after construction elevation certificate required?
      Property line setbacks appear to be met? Yes
      Road R-O-W setbacks appear to be met? Yes
      Bluff setbacks appear to be met? N/A
      Septic Tank setback appears to be met with/without an engineer's report? N/A
      Septic Drainfield setback appears to be met with/without an engineer's report? N/A
      Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
      Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
      Is this After-The-Fact? No
      Zoning Inspector:
      SSTS Type:
      SSTS Design:
      New or Replacement SSTS:
      GPD:
      # of bedrooms:
      Does this system require an Operating Permit?
      Operating Permit #:
      Does this system belong to an other establishment?
      Is this a Cluster System?
      Attachments:
        Zoning Inspector: Kevin Turnock
        Attach necessary inspection forms/photos:
          Notes:
          Not meeting right of way setback. Staked at approximately 16 feet. Will need to apply for a variance.
          Was an onsite conducted for this application? Yes
          Self Install?
          Installer Name:
          None
          New Tanks:
          Existing Tanks:
          Date of Final Inspection:
          Attach Final Certificate of Installation:
            Low Interest Loan or SSTS Grant project?
            Powered by