OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | erics@aaaparts.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Go east on 169 then go right onto 210 Head north on 65 then turn right onto Lake Ave then go left on 202nd PL then left again on 508th Ln. 19920 508th Ln |
Project Description
Please describe your proposed project: | Small boulder structure for the beach area that will be 30' with approximately 6' x 90' of riprap installed on 8 oz fabric for erosion control. |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of alteration. Location of erosion control measures. Distance of alteration to property lines. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Sand Rock Boulders |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 20 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 0 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Before the start of the project, the silt fence will be installed into the water to protect from erosion. |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #51029 (09/01/2020)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/01/2020 12:05 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 09/01/2020 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Cary L. Deason - 09/01/2020 12:23 PM 1c25bf1f8ffb2d9c6ea4573f9394094e eaeed79567f5683d7f9e958884f7954f |
#1 Adminstrative Approval Group | Shannon Westerlund - 09/01/2020 2:20 PM 8efe66fb4f06b444f423c4e3c133f852 5a922b4cc0ad5bba4edd106ae4bb64af |
Public Notes
Text: | Refund issued 9/10/20 Kb |
File(s): |
Internal Notes
Text: | |
File(s): |