Land Alteration Permit # 2020-5649, App. # App-2020-006283, UID # 200822
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
greg rono
Phone:
(218839 - 3371
Email Address:
randrsales@live.com
Mailing Address:
42880 260th Lane
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(320248 - 3289
Property Owner Email Address: joenorthwoods@yahoo.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
11-1-12040027477 435th Ave
AITKIN, MN 56431
HAZELTON TWPSISOTAS:4 T:45 R:27RDFARM ISLAND LAKETURBES, CHRISTOPHER J & ANA ETURBES, CHRISTOPHER J & ANA E
Driving directions to the property from Aitkin.:
169 to 435th on right

Project Description

Please describe your proposed project:
remove rock shape bank reinstall rock
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Rock
Total Amount of Excavation and/or Fill proposed? (cubic yards) 10 CuYd
Total Area to be Graded and/or Filled? (L x W) 240 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
grass

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #50732 (08/03/2020)

Charge Cost Quantity Total
Non-Taxable
added 08/03/2020 2:29 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 08/03/2020$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantGreg Rono - 08/03/2020 2:31 PM
eab711e2a6cd7b540697a970680c6533
79aa4c2c5d3f310cd3878b322f79f68a
#1 Adminstrative Approval GroupSam Seybold - 08/03/2020 2:43 PM
71157fdf2da0d7664d00686813438929
ca48751f1252468820fd578bf0868cf6
#2 Inspector GroupSam Seybold - 08/03/2020 2:47 PM
ab651456087df14047e501b055a9431f
5ba4f5f59cafc18c6aa4d0db9f1045ad
#3 Final ActionKim Burton - 08/03/2020 3:11 PM
325aaebd28f73337c100d6881b8c5302
e65d86b4d162ef322c2cabf7d494a59f
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit # 45323. Approved to reinstall preexisting rip-rap and add more rock to make DNR approved 3 to 1 slope.
File(s):

Internal Notes

Text:
Reinstalling pre existing rip-rap.  Site visit  8/3/20   ss
File(s):
    Powered by