Land Alteration Permit # 2020-5680, App. # App-2020-006234, UID # 200736
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Jordan Hawkinson
Phone:
(218341 - 5015
Email Address:
jjhawkinson4@gmail.com
Mailing Address:
50658 lily ave
McGregor MN 55760
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(218426 - 3816
Property Owner Email Address: jjhawkinson4@gmail.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-0-043401SHAMROCK TWPS:20 T:49 R:23GDBIG SANDY LAKEHAWKINSON, JON A & JUNE DHAWKINSON, JON A & JUNE D
Driving directions to the property from Aitkin.:
go north on hiway 65 from McGregor to Sather store turn left on county 14 lake Ave turrn left on Big sand lodge rd first driveway on right before lodge

Project Description

Please describe your proposed project:
To repair previous owners started unfinished project to help keep hill from erosion by re-vegetating bluff and installing rock along highly erodible banks.  Rocks added will have vegetation interspersed among them and in front of them.  Wood stairway will be created to provide walking access to the toe of the bluff.
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all proposed structures.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Boulders
If other, please explain:
rock wall to stop hill from eroding followed by vegetation.
Total Amount of Excavation and/or Fill proposed? (cubic yards) 10 CuYd
Total Area to be Graded and/or Filled? (L x W) 150 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Seeding and/or Mulching
Tree Planting
Describe how you intend to implement this plan
and your finished vegetation plan.:
Once the walls are built and everything is in place, I will sod and seed the disturbed area and also plant trees/shrubs by wall.

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #50644 (07/27/2020)

Charge Cost Quantity Total
Non-Taxable
added 07/27/2020 10:22 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 08/06/2020$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJordan J. Hawkinson - 07/27/2020 10:26 AM
03b5306af511bfea9ac7346d03f7bf60
c053c5402f77a506eb0f7d071349959c
 
#1 Adminstrative Approval GroupSam Seybold - 08/11/2020 9:06 AM
6ea7bfd11f8086a7aded6c0cc0aa0bbd
1ea0440412e448080e95165488115745
 
#2 Inspector GroupSam Seybold - 08/11/2020 9:07 AM
db380214127635b1c2d3607d9799d489
a7426bb8c47b7625be3e584825952171
 
#3 Final ActionKim Burton - 08/11/2020 11:52 AM
5941f199fefcd52f9941fa4c419aefd7
d7238546bf469fbf8cd743f1ee15e155
 
Application has been approved. All signatures have been obtained.
Text:
Permit # 45353. Approved to stop the bluff erosion by re-vegetating bluff and installing rock along highly erodible banks.  Rocks added will have vegetation interspersed among them and in front of them.
File(s):
Text:
Current owner is stopping erosion by re-vegetation and rock in the worse places.  Wood stairway will be created to provide walking access to the toe of the bluff.
File(s):
    Date application was complete: 07/27/2020
    This review has been started by: Kim Burton
    Zoning District of project location: Shoreland
    Zoning Inspector: Sam Seybold
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone? Yes
      Was an onsite conducted for this application? Yes
      Is this an After-The-Fact application?
      Project located in the floodplain?
      Base Flood Elevation:
      Powered by