Land Use Application App. # App-2020-006210, UID # 200698
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Ronald Gerald McNevin
Phone:
(612581 - 3853
Email Address:
janeenaydt@gmail.com
Mailing Address:
29938 270th Lane
Aitkin Mn 56431 2041
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
21-1-08140029938 270TH LN
AITKIN MN 56431
MALMO TWPOAK HILLSS:2 T:45 R:25NELITTLE SUGAR LAKE (MALMO TWP)MCNEVIN, RONALDMCNEVIN, RONALD
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
Hwy 47 south of Glen to 270th lane take a left go 2miles on 270th Lane  take a left at 29938 mailbox number and a Ron McNevin painting sign out front.

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
I am proposing to build 24' x 34' open lean shed with posts in ground and a steel roof.
What is the height of your structure? 10 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 816 ft2
Item 2- Structure Type (if applicable): Accessory Building

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 500 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 0 CuYd
How close to the property line will any fill be placed or any excavation be done? 25 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Nothing, No erosion will happen as no fill will be used or removed during construction of open lean shed I propose to build.

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
.

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #50606 (07/22/2020)

Charge Cost Quantity Total
Non-Taxable
added 07/22/2020 1:12 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 07/22/2020$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantRonald G. McNevin - 07/22/2020 5:49 PM
1fc1e006aaf8cd935386990d0d21deab
9509dd34ae2863d19e966c8eb57428d2
#1 Adminstrative Approval GroupShannon Westerlund - 07/22/2020 4:20 PM
f3bdd27df7786169efe3e828da9721e9
93fc4ccd75bd0763dc4b6a049389d897
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Denied- applicant withdrew. full refund to be issued. sw 8/7/20

Applicant called; wants to wait for inspection, plan might change. He will let us know after the weekend. sw 7/24/20

Refund issued 8/7/20 Kb
File(s):

    Admin Checklist

    Date application was complete: 07/22/2020
    Review started by: Kim Burton
    Zoning District of project location: Shoreland
    Required OWHL setback distance:
    "Other" OHWL setback distance is:
    Project located in the floodplain? No
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? N/A
    Septic Tank setback appears to be met with/without an engineer's report? Yes
    Septic Drainfield setback appears to be met with/without an engineer's report? Yes
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact? No

    Inspector Checklist

    Zoning Inspector:
    Attach necessary inspection forms/photos:
      Notes:
      Was an onsite conducted for this application?
      Powered by