OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone: |
|
||||
Property Owner Email: | jfarls@frontier.com |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | East on210 to McGregor,North 0n 65 to Goshawk.Right to Co.Rd, 40.Left on Co. RD. 40.Right on 166th. ave. property will be on the right. |
Septic Type
Select the system you are applying for: | Residential Holding Tank (Type 2) |
Design Information
Attach Septic Design & Management Plan: |
|
Designer Name: |
None
|
Pumping Agreement
Attach Signed Pumping Agreement: |
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License Number: | L-1919 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #50508 (07/13/2020)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/13/2020 6:57 AM | $200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 07/13/2020 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Jarold Farley - 07/13/2020 6:58 AM 87f5a70b444b21b1aef8b24dc86b3a0c f47154fe8278d6e5f10b74c9f9ce6b5a | |
#1 Adminstrative Approval Group | Shannon Westerlund - 07/14/2020 11:32 AM f5ca09f1029ba8160af3b0f8fef7f46a f2098eaaa7f144b3c7981d27fce90c00 | |
#3 Final Approval | Shannon Westerlund - 07/14/2020 11:42 AM c7c9e4296a657c1db6b86e85aae21322 b9e7548a89329bbc5d8f482403dcff25 | |
#2 Inspector Group | Kevin Turnock - 07/14/2020 11:34 AM cba3edf157f94a1879fae1ee3b2c44cb b117d82a2358f4691dfb733f55e25e2e |
Text: | Permit 45235 approved for Type II holding tank septic |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 07/13/2020 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | Yes |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Design Reviewed By: | Kevin Turnock |
SSTS Type: | Type II |
SSTS Design: | Holding Tank(s) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 2 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |
Self Install? | |
Installer Name: |
None
|
# of New Tanks: | 2 |
# of Existing Tanks: | 0 |
Date of Final Inspection: | 07/17/2020 |
Attach Final Certificate of Installation: |
|