Land Use Application Permit # 2020-5462, App. # App-2020-006061, UID # 200441
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Douglas Falk
Phone:
(218232 - 4422
Email Address:
dkfalk41@yahoo.com
Mailing Address:
43651 351st ln
Aitkin mn 56431
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
48-0-05270031408 580TH LN
PALISADE MN 56469
51-25 UNORGS:33 T:51 R:25FALK, DOUG & JACOBSON, KRISTIN TTEEFALK, DOUG & JACOBSON, KRISTIN TTEE
Does your property have an E911 address assigned? No
Enter directions to the property (if no property address assigned):
169 to right on co rd 18, left on 320th pl, right on 580th

Project Checklist

1.) Is the property zoned Shoreland? No
3.) Are there any wetlands or lowlands on/near the project site? Yes
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
8 X 12 shed
What is the height of your structure? 8 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 96 ft2

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #50357 (06/29/2020)

Charge Cost Quantity Total
Non-Taxable
added 06/29/2020 11:01 AM

$50 Flat Fee

$50.00 x 1 $50.00
Grand Total
Total $50.00
Payment 06/29/2020$50.00
Due$0.00

Approvals

ApprovalSignature
ApplicantDouglas Falk - 06/29/2020 11:03 AM - witnessed by Kim Burton
c7a16015d89d7f2613dda1b663179c37
681e7eba71af68ef44867849949d32cd
#1 Adminstrative Approval GroupKim Burton - 06/29/2020 11:06 AM
ad261fc1e71936b5268f59e68579a1a3
e3c7dcc427c4d7791efe3580888a4f1b
#2 Inspector GroupKim Burton - 06/29/2020 11:06 AM
b7465bb79ad0af91ef723b6b9b2bed0f
bda607e3e7ad2fc4ca12be6baea342b3
#3 Level Three Final ActionMolly Burman - 06/29/2020 11:11 AM
e1ce2bb1ade2700e2264cdaccbdf28e0
810ce9ea4886706f3bcd6d6efe6d6ce1
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #45190. Approved for an 8 X 12 shed
File(s):

Admin Checklist

Date application was complete: 06/29/2020
Review started by: Kim Burton
Zoning District of project location: Open
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? N/A
Septic Drainfield setback appears to be met with/without an engineer's report? N/A
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Terry Neff
Attach necessary inspection forms/photos:
    Notes:
    otc per terry
    Was an onsite conducted for this application?
    Powered by