OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | No |
Enter directions to the property (if no property address assigned): | Take 169 East to Hwy 210. Drive East on 210 to McGregor. At McGregor turn North on 65. At Sather's Hardware and Grocery take a right onto Lake Ave. At Lily Ave take a right. Go to 170th Pl and take a left onto 170th Pl. Go to 580th Ln. We are the corner property and have the first new driveway on the right. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | No |
Project Description
Please describe your proposed project: | I am proposing to build a 32 x 40 storage pole building. The walls will be 12 feet. There will be one 10 x16 overhead door and one man door on the front of the building facing 580th Ln Height to peak of roof will be 17 to 18 ft |
What is the height of your structure? | 17 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 1280 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
There is a Northland Buildings sign near the driveway. Estimated start time for the building is early of August 2020 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #50139 (06/09/2020)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/09/2020 4:40 PM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 06/09/2020 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Jeffrey C. Bowden - 06/09/2020 4:43 PM b428857c8029c0cfc48da25d526e5999 56bdf6869fb50f92d2d0b57255315367 |
#1 Adminstrative Approval Group | Shannon Westerlund - 06/10/2020 1:26 PM cf1d220a4b23cc978ab48479b4af79a4 6c28a1f1bbe3eda1a497aa43756b5f75 |
#2 Inspector Group | Bryan Hargrave - 06/22/2020 7:14 PM b5e44975fdb6491f3309b943f09ca7a7 e75009af0713b833c0e603ec4b085263 |
#3 Level Three Final Action | Molly Burman - 06/25/2020 9:57 AM 0b90fe41edd0e11e7765aa75258b9860 bc93976c37675ac0fb53c26e91ed6570 |
Public Notes
Text: | Permit #45163. Approved for 32'x40' Accessory Building (Not for human habitation, not for commercial use) |
File(s): |
|
Admin Checklist
Date application was complete: | 06/09/2020 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: | |
Notes: | Meets all setbacks. |
Was an onsite conducted for this application? | Yes |