App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | South on 169, Right on 250th St, straight thru stop sign, stay left at curve, left on trillium trail (445th Pl), follow road all the way down to the end, to the lake. tan cabin with vinyl siding on left at the end of the road (to the left of the blue cabin at the end of the road). |
Project Description
Please describe your proposed project: | Need to repair approximately 100 ft of current riprap shoreline. Significant amount of soil is exposed and the risk of erosion is high. Landscaper said that they need to bring in approximately 20 yards of rock to repair. No excavating or moving of land or soil or vegetation will be done, just adding additional rock to existing riprap. |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Rock Boulders |
If other, please explain: | Large rocks for rip rap shoreline |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 0 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 300 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Just placing rocks on top of existing riprap shoreline, not excavating or moving any soil or vegetation. If any of the grass is disrupted by bobcat or equipment, that will be reseeded. |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #49838 (05/15/2020)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/15/2020 12:18 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 05/15/2020 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Jesse Heiling - 05/15/2020 12:18 PM e2f7a8bcd30ad7584e7ecd85a3ed0f9e 7b86c6c346609f7995f59da14342e4c0 | |
#1 Adminstrative Approval Group | Sam Seybold - 05/21/2020 1:22 PM e1df8809308474bb6c52f805fd198bc5 98cf0170f5bf23b4f5ef362e8a726053 | |
#2 Inspector Group | Sam Seybold - 05/21/2020 1:26 PM f35b3e17852b5f07612f8ae72d3a18e2 0dfd3e0946989ce3af764cf976ba82bc | |
#3 Final Action | Molly Burman - 05/21/2020 1:46 PM 3bd54c74bb0ebeda87a80bf1ae70d929 52d78561d1d1446d5ab2160adbcb5d34 |
Text: | Permit # 45026. Approved for the addition of 20 cubic yards of rock to repair existing rip-rap. |
File(s): |
|
Text: | Emailed to Sam 5/19/20 Kb Site visit 5/21/20 Needs more rock to hold the bank with the existing rip-rap and vegetation. SS |
File(s): |
Date application was complete: | 05/15/2020 |
This review has been started by: | Sam Seybold |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Sam Seybold |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | |
Base Flood Elevation: |